Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a revolutionary device that seamlessly combines steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement. This equipment is mounted on a vehicle chassis, ensuring unparalleled flexibility, effortless transitions, and swift emergency response. It operates with remarkable reliability and efficiency in any environment. Featuring remotely operated booms and the option for manual control in the hanging basket, this trolley significantly reduces labor costs, minimizes construction risks, enhances efficiency, and paves the way for standardized and factory-based tunnel vertical arches.
Equipment Digitization (Optional): Our cutting-edge digitization options include cluster management, precise positioning, video surveillance, intercom, pre/alarm functionalities, comprehensive data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, and remote control capabilities.
High Efficiency: Equipped with three arms and three grippers, along with a highly versatile multi-degree-of-freedom manipulator. The single arm boasts a maximum lifting force of 1.5 tons, meeting the stringent demands for prefabricated arch installation, various benching methods, and precise arch positioning and adjustment. The entire vertical support construction process is completed within an hour, ensuring top-notch efficiency.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5), we manufacture the arch frames outside the tunnel. This innovation drastically reduces the required working time on hazardous surfaces, mitigates construction safety risks, and significantly boosts overall efficiency.
Less Operating Personnel: This advanced system allows the entire construction operation to be executed by just 3 people, compared to the traditional requirement of 8 or more personnel.
Additional Options: Based on specific needs, various functions can be added, such as electric drives for hydraulic systems, breakers for under-excavation operations, electric welding machines, and more.