Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig

Product Details
Customization: Available
After-sales Service: 6 Month
Warranty: 6 Month

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (24)
  • Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig
  • Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig
  • Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig
  • Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig
  • Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
LCG312C
Condition
New
Arms
3
Total Weight
30t
Engine Power
176kw
Operating Voltage
380V
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
lanhai
Origin
China

Product Description



Product Description

The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a device that integrates steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement. The equipment adopts a vehicle chassis to meet the needs of flexible movement, transition and emergency of the equipment, and can complete the work reliably and efficientlyin any occasion. All three booms can be operated remotely, and the left and right booms can be manually controlled in the hanging basket, which can reduce labor costs, mitigate construction risks, improve efficiency, and achieve standardization and factoryization of tunnel vertical arches.
Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigHigh efficiency: Three arms and three grippers are used, along with a multi-degree-of-freedom manipulator. The maximum lifting force of the single arm is 1.5 tons, which can meet the requirements for prefabricated arch installation,   various benching method operations and precise positioning and adjustment of the arch. All construction procedures for the vertical support take about an hour.
Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigInstallation of prefabricated arch frames: Our company's patented multi-frame prefabricated segmented assembly installation techniques(A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5)are used to produce the arch frames outside the tunnel. This reduces the required working time on dangerous surfaces and construction safety risks,   and greatly improves overall efficiency.
Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigLess operating personnel: The entire construction operation can be completed by just 3 people, while traditional operations require 8 or more.
Additional options: Some functions can be selected based on actual conditions, including the electric drive for hydraulic systems, breaker for under-excavation operations, electric welding machine, and more.

Product Parameters
Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      
Detailed Photos

Vehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling RigVehicle-Mounted Tunnel Equipment with Integrated Arch Frame Truck Mounted Drilling Rig

FAQ

1,What can you buy from us?

Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.

2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.

3,What payment terms do you accept?
We accept T/T with a 50% prepayment.

4,What about the order lead time?
The usual lead time is 15 days.

5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.

6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.

7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier