Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The LG312M intelligent integrated arch frame trolley masterfully converges multiple processes, such as precise measuring and point placing, under-excavation operations, arch frame installation, welding mesh, and rib connection. It effortlessly completes the installation of arch frames during a single excavation of a double-track tunnel without requiring machine relocation. Constructed on a robust engineering chassis and powered by a diesel-electric dual power system, it boasts a two-way driving platform that ensures exceptional driving performance, adapting seamlessly to various complex tunnel conditions. The arm frame is maneuvered via wireless remote control and manual operations, allowing for accurate control of the robotic arm's movements. This state-of-the-art machine is designed to deliver fast, efficient, energy-saving, and safe operations.
Equipment Digitization (Optional): This optional feature includes advanced functionalities such as cluster management, precise positioning, video surveillance, walkie-talkie capabilities, pre/alarm notifications, comprehensive data management, tunnel BIM technology, digital twin modeling, construction report management, tunnel contour scanning, and remote control capabilities.
Expandable Hanging Basket: The equipment is outfitted with an expandable hanging basket, providing a spacious operating area ideal for installing explosives and anchor rods, enhancing operational efficiency and safety.
High Efficiency: Featuring an innovative three-arm, three-gripper, and three-basket structure, the equipment's middle arm boasts a maximum lifting force of 3 tons. It supports diverse construction methods, including full-section, two-benching, and three-benching techniques. The entire setup process is swift, taking approximately an hour to complete.
Installation of Prefabricated Arch Frames: Employing our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, arch frames are efficiently produced outside the tunnel. This significantly reduces the working time on hazardous surfaces, minimizes construction safety risks, and greatly enhances overall efficiency.
Reduced Operating Personnel: The entire construction operation is streamlined to be completed by merely 3-4 people, compared to the traditional requirement of 8 or more personnel, ensuring cost-effectiveness and efficiency.
Auxiliary Function Integration: The equipment integrates essential auxiliary functions, featuring a breaker hammer and welding machine capable of performing under-excavation processing and welding operations during arch installation.
Compact Overall Design: Engineered with a lightweight and compact design, the vehicle is exceptionally adaptable to small-section construction conditions, offering unparalleled maneuverability.