Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent integrated arch frame trolley, LG312M, is a state-of-the-art equipment that seamlessly incorporates multiple complex processes such as point measuring and placement, under-excavation operations, arch frame installation, mesh welding, and rib connection. This advanced machine allows for continuous installation of arch frames during the double-track tunnel excavation without necessitating a relocation. Built on a robust engineering chassis, it features diesel-electric dual power systems and a two-way driving platform, ensuring exceptional driving performance and adaptability to various challenging tunnel conditions. The arm frame is operated via wireless remote control and manual control, enabling precise and effortless movement of the robotic arm, characterized by its speed, efficiency, energy-saving capabilities, and enhanced safety measures.
Equipment Digitization (Optional): Our advanced digital suite includes cluster management, positioning capabilities, video surveillance, walkie-talkie integration, pre-alert functions, data management, tunnel BIM technology, digital twin modeling, construction report management, tunnel contour scanning, remote control, and more. This suite significantly enhances operational efficiency and safety.
Expandable Hanging Basket: Equipped with an expandable hanging basket, this machine offers a larger operating space suitable for installing explosives and anchor rods, thus expanding its utility in various tunneling operations.
High Efficiency: Featuring a three-arm, three-gripper, and three-basket structure, this equipment offers a maximum lifting force of 3 tons in the middle arm. It supports various construction methods like full-section, two-benching, and three-benching, with complete setup achievable in approximately an hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding techniques, the arch frames are produced outside the tunnel. This significantly reduces the time spent on hazardous surfaces, minimizes safety risks, and greatly enhances overall efficiency.
Reduced Workforce Requirement: This innovative system allows the entire construction operation to be managed by only 3-4 operators, compared to the 8 or more required in traditional setups.
Auxiliary Function Integration: The equipment integrates a breaker hammer and welding machine, enabling under-excavation processing and welding operations simultaneously with the arch installation, thus streamlining the entire construction process.
Compact Design: Designed to be lightweight and compact, this vehicle is perfectly suited for small-section construction conditions, offering unparalleled maneuverability and efficiency.