• Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment
  • Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment
  • Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment
  • Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment
  • Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment
  • Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment

Arch Frame Trolley for Vehicle-Mounted Tunnel Equipment

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C The intelligent integrated vehicle-mounted Arch Frame Trolley is a state-of-the-art device combining steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Capable of meeting the flexible movement, transition, and emergency needs, this trolley operates with unmatched reliability and efficiency in any setting. Featuring remote operation for all three booms and manual control in the hanging basket for the left and right booms, it significantly reduces labor costs, mitigates construction risks, boosts efficiency, and assures the standardization and factory-level precision of tunnel vertical arches.

Equipment Digitization (Optional): Includes cluster management, positioning function, video surveillance, intercom function, pre/alarm function, data management function, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control, and additional advanced features.

High Efficiency: Equipped with three arms, three grippers, and a multi-degree-of-freedom manipulator, the system boasts a maximum lifting force of 1.5 tons per arm. This setup is ideal for prefabricated arch installation, various benching method operations, and precise positioning and adjustment of the arch. Completing all vertical support construction procedures within an hour, it ensures peak operational efficiency.

Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5), arch frames are produced externally to the tunnel. This method significantly reduces working time on hazardous surfaces, lowers construction safety risks, and greatly enhances overall efficiency.

Reduced Operating Personnel: The entire construction process can be efficiently completed by just three personnel, compared to eight or more required in traditional operations, ensuring labor optimization.

Additional Options: Based on actual conditions, supplementary features include electric drive for hydraulic systems, a breaker for under-excavation operations, electric welding machines, and more, offering customizable functionality.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Arch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel EquipmentArch Frame Trolley for Vehicle-Mounted Tunnel Equipment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01