Customization: | Available |
---|---|
Total Weight: | 28t |
Engine Power: | 138.5kw |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent integrated arch frame trolley is a marvel of modern engineering, seamlessly combining multiple processes such as measuring, point placement, under-excavation operations, arch frame installation, welding, and rib connection. It ensures the installation of arch frames during a single excavation of a double-track tunnel without requiring machine relocation. The vehicle boasts an engineering chassis, dual diesel-electric power systems, and a two-way driving platform structure, all contributing to its superior driving performance and adaptability to complex tunnel road conditions. The arm frame can be controlled wirelessly or manually, allowing precise and effortless handling of the robotic arm. This results in a machine that is not only fast and efficient but also energy-saving and safe.
Equipment Digitization (Optional): Our optional equipment digitization suite includes features such as cluster management, positioning, video surveillance, walkie-talkie, pre/alarm functions, data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control, and more.
Expandable Hanging Basket: Equipped with an expandable hanging basket, the equipment offers a spacious operating area suitable for installing explosives and anchor rods.
High Efficiency: Featuring a three-arm, three-gripper, and three-basket structure, the equipment achieves maximum lifting capabilities of up to 3 tons with the middle arm. It supports various construction methods such as full-section, two-benching, and three-benching, and can be set up in approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding techniques, arch frames are produced externally to the tunnel, reducing the time spent on hazardous surfaces and significantly enhancing construction safety and efficiency.
Fewer Operating Personnel: The entire construction operation can be efficiently completed by a team of just 3-4 people, as opposed to the traditional requirement of 8 or more.
Auxiliary Function Integration: The equipment is fully integrated with a breaker hammer and welding machine, enabling seamless under-excavation processing and welding operations during arch installation.
Compact Size: Its lightweight design and compact overall size allow the vehicle to easily adapt to small-section construction conditions.
Transport dimensions (L × W × H) | 11800×3200×3200mm |
Total weight | 28t |
Engine power | 138.5kW |
Installed electrical power | 87.5kW |
Operating mode | Electric construction + diesel-powered emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 18×12.5m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (Dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 400mm |
Maximum grade | 32% |
Turning radius | 15m (two wheels) 8m (four wheels) |
Maximum speed | 25km/h |
Approach angle/departure angle | 17°/15° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.