After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Total Weight: | 38t |
Engine Power: | 138.5kw (National IV) |
Customization: |
---|
Suppliers with verified business licenses
The LGM312N The intelligent integrated arch anchor trolley adopts a cutting-edge engineering chassis and boasts a dual anchor system. This machine excels with its four-wheel steering, four-wheel drive, and two-way driving capabilities. Its diesel-electric dual power system ensures seamless electric construction and reliable diesel-powered emergency operations. The three-arm remote control system is meticulously designed to accommodate prefabricated arch frame installation, diverse benching methods, and precise positioning adjustments of the arch frame. It adeptly handles under-excavation and welding operations during installation, ensuring unparalleled flexibility in tunnel construction.
Functional integration: The intelligent integrated arch anchor trolley masterfully integrates multiple processes, including measurement and point placement, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, optional anchor grouting, and more.
Equipment digitization (Optional): The digitization features include cluster management, precise positioning, video surveillance, walkie-talkie functionality, pre/alarm functions, comprehensive data management, tunnel BIM technology and digital twin, and detailed construction reports.
management, tunnel contour scanning, advanced remote control capabilities, and various other functions.
High efficiency: With its innovative three-arm, three-gripper, and three-basket structure, the LGM312N offers a maximum lifting force of 3 tons by the middle arm. The entire construction process is impressively completed within approximately an hour.
Installation of prefabricated arch frames: Utilizing our patented techniques for multi-frame prefabricated segmented assembly and folding arch frame installation, the arch frames are produced outside the tunnel. This approach minimizes time spent on hazardous surfaces, significantly enhances construction safety, and boosts overall efficiency.
Dual anchor system: Capable of a maximum drilling depth of 4.5m, the left and right arm frames can simultaneously execute feet locking, system anchoring, and advance anchoring operations.
Rotating deployable hanging basket: Equipped with a rotating hanging basket, this apparatus provides ample operating space ideal for the installation of explosives and anchor rods.
Optional grouting function: The optional grouting system enables swift grouting operations immediately after anchor installation, enhancing operational efficiency.
Less operating personnel: The entire construction process can be efficiently managed by just 3-4 individuals, a significant reduction from the traditional requirement of 8 or more personnel.
Auxiliary function integration: This versatile equipment also includes a breaker hammer and welding machine, facilitating under-excavation processing and welding operations during arch installation.
Suppliers with verified business licenses