After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Total Weight: | 38t |
Engine Power: | 138.5kw (National IV) |
Customization: |
---|
Suppliers with verified business licenses
The LGM312N The intelligent integrated arch anchor trolley embraces an innovative engineering chassis, complemented by a sophisticated dual anchor system. It boasts four-wheel steering, four-wheel drive, and bi-directional driving capabilities. The diesel-electric dual power system ensures seamless electric construction and emergency diesel operations. Featuring a three-arm remote control, this machine excels in prefabricated arch frame installation, a variety of benching methods, and precise frame positioning. The versatile arch frame facilitates under-excavation and welding operations during installation, ensuring exceptional flexibility within tunnels.
Functional integration: This intelligent integrated arch anchor trolley masterfully integrates numerous processes, including point measurement and placement, under-excavation, arch frame and anchor net installation, advance support, system anchor construction, and optional anchor grouting, among others.
Equipment digitization (Optional): The equipment offers advanced digital features such as cluster management, precise positioning, video surveillance, walkie-talkie functionality, pre/alarm systems, comprehensive data management, tunnel BIM technology, digital twin, and detailed construction reporting.
management, tunnel contour scanning, remote control, and more.
High efficiency: With a robust three-arm, three-gripper, and three-basket structure, the middle arm boasts a maximum lifting force of 3 tons. Remarkably, the entire construction process is completed in about an hour.
Installation of prefabricated arch frames: Our patented multi-frame prefabricated segmented assembly and folding arch frame techniques streamline arch frame production outside the tunnel, minimizing work time on dangerous surfaces, reducing construction safety risks, and significantly enhancing overall efficiency.
Dual anchor system: Boasting a maximum drilling depth of 4.5m, the left and right arm frames can simultaneously execute feet locking, system anchoring, and advance anchoring operations.
Rotating deployable hanging basket: The equipment features a spacious rotating hanging basket, ideal for the installation of explosives and anchor rods.
Optional grouting function: Equipped with an optional grouting system, the equipment facilitates swift grouting operations post-anchor installation.
Less operating personnel: Thanks to its advanced design, the entire construction operation can be efficiently managed by just 3-4 personnel, compared to traditional methods requiring 8 or more.
Auxiliary function integration: The equipment integrates a breaker hammer and welding machine, optimizing under-excavation processing and welding operations during arch installation.
Suppliers with verified business licenses