After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Total Weight: | 36t |
Engine Power: | 138.5kw (National IV) |
Customization: |
---|
Suppliers with verified business licenses
The LGM312U The intelligent integrated arch anchor trolley features an advanced engineering chassis and is equipped with a single anchor system. This groundbreaking machine boasts four-wheel steering, four-wheel drive, two-way driving, and a host of other capabilities. Its diesel-electric dual power system ensures robust electric construction and reliable diesel-powered emergency operations. The state-of-the-art three-arm remote control is designed to effortlessly meet the requirements for prefabricated arch frame installation, accommodate diverse benching methods, and achieve precise positioning adjustments of the arch frame. This versatile arch frame also supports under-excavation and welding operations during installation, offering superior flexibility within tunnels.
Functional integration: The intelligent integrated arch anchor trolley amalgamates multiple critical processes into a single unit. This includes measuring and placing points, executing under-excavation operations, installing arch frames, providing advance support, constructing system anchors, optional anchor grouting, and installing anchor nets.
Equipment digitization (Optional): The equipment offers optional digitization features such as cluster management, precise positioning, video surveillance, walkie-talkie capabilities, pre-alarm functions, comprehensive data management, integration with tunnel BIM technology and digital twins, and construction report management. Additional functionalities include tunnel contour scanning and remote control operations.
management, tunnel contour scanning, remote control and other functions.
High efficiency: Featuring a three-arm, three-gripper, and two-basket structure, the equipment provides a maximum lifting force of 2 tons with its middle arm. The entire construction process is streamlined to be completed in approximately an hour, significantly boosting productivity.
Installation of prefabricated arch frames: Our company's patented techniques for multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation are utilized to manufacture arch frames outside the
tunnel. This innovative approach reduces working time on hazardous surfaces, minimizes construction safety risks, and dramatically enhances overall efficiency.
Single anchor system: The system boasts a maximum drilling depth of 4.5m, and the middle arm frames can execute feet locking, system anchoring, and advance anchoring operations with precision.
Expandable hanging basket: Equipped with an expandable hanging basket, the equipment provides an enlarged operating space, ideal for the installation of explosives and anchor rods.
Optional grouting function: The equipment includes an optional grouting system, facilitating rapid grouting operations immediately after anchor installation. This optional feature ensures robust and secure anchoring.
Less operating personnel: The streamlined construction operation can be effectively managed by just 3-4 personnel, compared to the 8 or more required for traditional methods, significantly reducing labor costs.
Auxiliary function integration: This innovative equipment is equipped with a breaker hammer and welding machine, enabling efficient under-excavation processing and welding operations during arch installation.
Suppliers with verified business licenses