Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley

Product Details
Customization: Available
After-sales Service: 6 Month
Warranty: 6 Month

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (24)
  • Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
  • Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
  • Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
  • Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
  • Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
LZG413A
Certification
CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition
New
Drill Hole Diameter
41~102mm
Drill Hole Depth
5.2m
Total Weight
57t
Engine Power
158kw
Installed Electrical Power
159kw
Operating Mode
Electric Construction + Diesel-Powered Emergency
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17.5×11m
Chassis Form
Operating Chassis
Driving Mode
Bidirectional Driving (Front and Rear Dual Cabs)
Driving and Steering Methods
Four-Wheel Drive, Four-Wheel Steering
Minimum Ground Clearance
370mm
Maximum Grade
36%
Turning Radius
16m (Two Wheels)/10m (Four Wheels)
Maximum Speed
15km/H
Approach Angle/Departure Angle
14°/14°
Transport Package
Nothing
Specification
14500× 3000× 3600mm
Trademark
LANHI
Origin
China

Product Description

Product Description
 
The LZG413A The intelligent integrated drilling and arch trolley, model LZG413A, is a state-of-the-art, dual-function machine designed for tunnel full-section construction and the benching method. This trailblazing equipment boasts a robust, integrated frame engineering chassis outfitted with dual rock drilling arms. Additionally, the standing arch frame features a dual-arm design, complete with three grippers and two handy hanging baskets. Enjoy the advantage of four-wheel steering, four-wheel drive, and two-way driving, along with both electric construction support and diesel-powered emergency response capabilities. Engineered for ease of operation, this machine is noted for its low failure rate, exceptional reliability, compact structure, and effortless maintenance.
Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
Functional Integration: This multi-functional marvel includes capabilities for tunneling and anchor hole construction, arch frame installation, charging, anchor installation, anchor grouting (optional), and anchor net installation.
Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
Wide Range of Applications: Perfect for three-step, two-step, and full-section construction methods, addressing all rock drilling and arch construction needs.Meeting the requirements of various construction methodologies seamlessly.
Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
Convenient Operation: Featuring both a local console and remote operation, this system is ideal for high-angle rock drilling and close-angle arch erection.
Equipment Digitization (Optional): Includes advanced features like cluster management, positioning function, video surveillance, walkie-talkie functionality, pre-alarm function, data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control, and more.
Rock Drilling and Vertical Arching: Outfitted with four operating arms, including two double-triangular self-balancing rock drilling arms and two vertical arch arms. Three grippers add to its versatility. With a maximum arm support lifting force of 2.5 tons, it meets all prefabricated arch frame installation and precise positioning needs. The entire construction process is impressively completed in about 1 hour.
Double Slip Structure: Our exclusive double slip mechanism ensures both stable and rapid slippage, optimizing performance.
Double Hanging Basket: Both the primary and secondary vertical arch arms come equipped with expandable hanging baskets. Post-drilling, these can be used to install anchor rods and auxiliary charges.
Grouting Function: An optional grouting system allows for swift grouting operations following anchor construction.
Auxiliary Functions: Outfitted with essential equipment like welding machines and power tools, making construction tasks more efficient and streamlined.
Product Parameters
 
Transport dimensions (L × W × H)  14500×3000×3600mm
Total weight 57t
Engine power 158kW
Installed electrical power 159kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17.5×11m
Chassis form Operating chassis
Driving mode Bidirectional driving (front and rear dual cabs)
Driving and steering methods Four-wheel drive, four-wheel steering
Minimum ground clearance 370mm
Maximum grade 36%
Turning radius 16m (two wheels)/10m (four wheels)
Approach angle/departure angle 14°/14°
Arm support mode Skid
Arm support quantity 4
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 2.5t
Maximum lifting capacity of left and right arms 1.5t
Number of rock drills 2
Power of rock drills 18kW
Maximum drilling depth 5.2m
Drilling diameter Φ41~Φ102mm
Discharge volume 0.98m³/min
Discharge pressure 0.8MPa
Flow rate 16m³/h
Pressure 20bar
Welding machines 3 sets
Breaking hammers /
Grouting system 1 set
 
Detailed Photos

Lzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling TrolleyLzg413A Integrated Tunnel Construction Solution with Efficient Drilling and Arching Capabilities Drilling Trolley
FAQ
 

1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.

2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.

3,What payment terms do you accept?
We accept T/T with a 50% prepayment.

4,What about the order lead time?
The usual lead time is 15 days.

5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.

6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.

7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.