Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Still deciding? Get samples of US$ 1000000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGMP350D intelligent integrated arch anchoring and spraying trolley is an integrated trolley for initial tunnel support operations jointly developed by Lanhai Intelligent Installation and the Sichuan Luqiao Tunnel Branch. The equipment features an engineering chassis, four-wheel drive, four-wheel steering, and front and rear bidirectional driving structures. The upper body features a three-arm full-sliding structure, three grab handles, two hanging baskets, two under-excavation hammers, and two anchor lever arms. The equipment can handle the entire process of initial tunnel support without leaving the site, and the construction processes inside the tunnel can be seamlessly connected, greatly improving construction efficiency, and reducing safety hazards and occupational injuries.
Functional integration: The intelligent integrated arch anchoring and spraying trolley integrates the entire process of the tunnel's initial support, which are: Initial spraying, measuring and setting points, under-excavation operations, arch frame installation, advanced support, system anchor construction, anchor net installation, shotcrete operations, etc.
Equipment digitization(Optional): including cluster management, positioning function, video surveillance, walkie-talkie function, pre/alarm function,data management function, tunnel BIM technology and digital twin, construction report management, tunnel contour scanning, remote control and other functions.
Large amount of shotcrete: Up to 50m³/h, providing high spraying efficiency and will not easily clog up pipes.
Less operating personnel: The entire construction operation can be completed by only 3-4 people, where traditional operations would require 8 or more.
Auxiliary function integration: The equipment comes with a breaker hammer and welding machine, which can perform under-excavation processing and welding operations when the arch is installed.
High efficiency: Three arms and three grippers, along with a multi-degree-of-freedom manipulator are used. The maximum grabbing force of the middle arm is 3 tons, which can meet requirements for prefabricated arch installation, various benching method operations and precise positioning and adjustment of the arch frame. All construction procedures required to complete erection take about an hour.
Installation of prefabricated arch frames: Our company's patented multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation techniques are used to produce the arch frames outside the tunnel. This reduces the required working time on dangerous surfaces and construction safety risks, and greatly improves overall efficiency.
Transport dimensions (L × W × H) | 13800×3900×3920mm |
Total weight | 51t |
Engine power | 142kW |
Installed electrical power | 163kW |
Operating mode | Electric construction + diesel-powered emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 20×14m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 400mm |
Maximum grade | 25% |
Turning radius | 15m (two wheels) 8m (four wheels) |
Maximum speed | 25km/h |
Approach angle/departure angle | 17°/18° |
Maximum spraying volume | 50m³/h |
Maximum particle size for spray aggregate | 16mm |
Hopper capacity | 0.4m³ |
Capacity of quick-setting agent tank | 1m³ |
Form of quick-setting agent pump | Squeeze pump |
Arm support mode | Skid |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 2 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Maximum drilling depth | 4.5m |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.89m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 8m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.