Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C is an intelligent integrated vehicle-mounted arch frame trolley that masterfully combines steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement into one seamless operation. Its vehicle chassis ensures unparalleled flexibility, allowing for smooth movement, swift transitions, and rapid emergency responses. This equipment performs with reliable precision and efficiency in any scenario. The advanced remote operation of all three booms, alongside the manual control option for the left and right booms in the hanging basket, significantly reduces labor costs, mitigates construction risks, boosts efficiency, and elevates the standardization and factoryization of tunnel vertical arches.
Optional Equipment Digitization: Our comprehensive digitization package includes cluster management, precise positioning, real-time video surveillance, intercom capabilities, proactive alarm systems, robust data management, cutting-edge tunnel BIM technology, and digital twin integration. With construction report management, tunnel contour scanning, and remote control functionalities, the system is designed to elevate every aspect of your tunnel operations.
Unmatched Efficiency: Featuring three arms and three grippers coupled with a sophisticated multi-degree-of-freedom manipulator, the LCG312C boasts a maximum lifting force of 1.5 tons per arm. This robust capacity meets the demands of prefabricated arch installations, various benching method operations, and the precise positioning and adjustment of arches. Remarkably, the vertical support construction procedures are completed in approximately one hour.
Innovative Prefabricated Arch Frame Installation: Leveraging our patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), arch frames are produced outside the tunnel. This innovative approach minimizes working time on hazardous surfaces, enhances construction safety, and significantly boosts overall efficiency.
Minimized Workforce Requirement: Our streamlined construction operation requires only 3 personnel, in stark contrast to the 8 or more needed for traditional methods, thus driving down labor costs and improving overall productivity.
Customizable Add-ons: Tailor the equipment to your specific needs with optional features such as an electric drive for hydraulic systems, a breaker for under-excavation operations, electric welding machines, and more.