• Arch Frame Trolley for Vehicle-Mounted Tunnel
  • Arch Frame Trolley for Vehicle-Mounted Tunnel
  • Arch Frame Trolley for Vehicle-Mounted Tunnel
  • Arch Frame Trolley for Vehicle-Mounted Tunnel
  • Arch Frame Trolley for Vehicle-Mounted Tunnel
  • Arch Frame Trolley for Vehicle-Mounted Tunnel

Arch Frame Trolley for Vehicle-Mounted Tunnel

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a groundbreaking device that seamlessly combines steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Designed with a robust vehicle chassis, it ensures exceptional flexibility in movement, transition, and emergency situations, effortlessly completing tasks reliably and efficiently in any scenario. All three booms can be operated remotely, with the left and right booms also manually controllable from the hanging basket. This innovation significantly reduces labor costs, mitigates construction risks, enhances efficiency, and paves the way for standardized and factory-based tunnel vertical arch construction.

Equipment Digitization (Optional): Our cutting-edge features include cluster management, precise positioning, video surveillance, intercom capabilities, pre/alarm functions, comprehensive data management, tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, remote control, and much more. These optional digital tools are designed to elevate your operational efficiency and safety to the next level.

High Efficiency: Equipped with three arms and three grippers, and a multi-degree-of-freedom manipulator, the LCG312C boasts a maximum lifting force of 1.5 tons per arm. This ensures it can effortlessly handle the installation of prefabricated arches, execute various benching method operations, and achieve precise positioning and adjustment of the arch. The entire vertical support construction process is streamlined to about an hour, maximizing productivity and minimizing downtime.

Installation of Prefabricated Arch Frames: Leveraging our patented multi-frame prefabricated segmented assembly installation techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), our machine produces arch frames outside the tunnel. This strategy considerably reduces the time required on hazardous surfaces, mitigates safety risks, and significantly enhances overall operational efficiency.

Minimized Operating Personnel: Remarkably, the entire construction operation can be efficiently managed by a team of just three people, a stark contrast to the traditional requirement of eight or more personnel, thus optimizing labor utilization and reducing costs.

Additional Options: Our equipment offers customizable options to suit specific operational needs, including an electric drive for hydraulic systems, a breaker for under-excavation operations, an electric welding machine, and more. These additions provide versatile solutions tailored to enhance and adapt to varying project demands.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Arch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted TunnelArch Frame Trolley for Vehicle-Mounted Tunnel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01