• Arch Frame Trolley for Vehicle-Mounted Mining Operations
  • Arch Frame Trolley for Vehicle-Mounted Mining Operations
  • Arch Frame Trolley for Vehicle-Mounted Mining Operations
  • Arch Frame Trolley for Vehicle-Mounted Mining Operations
  • Arch Frame Trolley for Vehicle-Mounted Mining Operations
  • Arch Frame Trolley for Vehicle-Mounted Mining Operations

Arch Frame Trolley for Vehicle-Mounted Mining Operations

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C The intelligent integrated vehicle-mounted Arch Frame Trolley is a groundbreaking piece of equipment delivering seamless steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement. Engineered with a robust vehicle chassis, it ensures agile mobility, swift transitions, and impeccable reliability in any environment. Operate all three booms remotely or manually control the left and right booms from the hanging basket, significantly reducing labor costs, mitigating construction risks, enhancing efficiency, and elevating tunnel vertical arch construction to new standards of precision and factoryization.

Equipment Digitization (Optional): Experience the future of mining operations with optional digital features such as cluster management, precise positioning, comprehensive video surveillance, intercom functionality, pre/alarm system, extensive data management, cutting-edge tunnel BIM technology and digital twin, construction report management, advanced tunnel contour scanning, and remote control capabilities, all designed to streamline and optimize your workflow.

High Efficiency: Equipped with three arms, three grippers, and a versatile multi-degree-of-freedom manipulator, this trolley boasts a maximum single-arm lifting force of 1.5 tons. Perfect for prefabricated arch installations and various benching methods, it ensures precise positioning and adjustment of the arch. Complete all vertical support construction procedures in just about an hour, revolutionizing efficiency and productivity.

Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly technique (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we manufacture arch frames outside the tunnel, minimizing on-site working time, reducing exposure to hazardous conditions, and drastically improving overall construction safety and efficiency.

Reduced Staffing Requirements: Streamline operations with minimal manpower. The entire construction process can be executed by just 3 personnel, a significant reduction from the 8 or more required in traditional methods.

Additional Options: Customize your equipment to meet specific operational needs with optional features like an electric drive for hydraulic systems, a breaker for under-excavation tasks, an electric welding machine, and more.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Arch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining OperationsArch Frame Trolley for Vehicle-Mounted Mining Operations

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01