Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The LGM312N intelligent integrated arch anchor trolley is a marvel of engineering, built on a robust chassis and equipped with a dual anchor system. It boasts four-wheel steering, four-wheel drive, two-way driving, and a versatile diesel-electric dual power system. This system ensures seamless electric construction and reliable diesel-powered emergency operations. The sophisticated three-arm remote control system meets the stringent requirements for prefabricated arch frame installation, supports various benching methods, and enables precise positioning adjustments. The arch frame is engineered to manage under-excavation and welding tasks during installation, offering unparalleled flexibility within the tunnel.
Functional integration: The intelligent integrated arch anchor trolley masterfully combines a multitude of processes into one cohesive unit. These include measuring and point placement, under-excavation operations, arch frame installation, anchor net installation, advanced support, system anchor construction, and optional anchor grouting, among many other functionalities.
Equipment digitization (Optional): Enhance your operations with optional digitization features such as cluster management, precise positioning, video surveillance, walkie-talkie communication, pre/alarm functions, comprehensive data management, tunnel BIM technology, digital twin, and detailed construction reporting.
management, tunnel contour scanning, remote control, and more advanced functionalities.
High efficiency: The innovative three-arm, three-gripper, and three-basket design ensures maximum efficiency. The middle arm can lift up to 3 tons, completing the entire construction process in approximately one hour.
Installation of prefabricated arch frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding arch frame techniques, the arch frames are manufactured outside the tunnel. This significantly reduces working time on hazardous surfaces, minimizes construction safety risks, and substantially boosts overall efficiency.
Dual anchor system: Designed for maximum performance, the dual anchor system features a drilling depth of up to 4.5m. The left and right arm frames can simultaneously execute feet locking, system anchoring, and advanced anchoring tasks.
Rotating deployable hanging basket: The trolley is equipped with a rotating hanging basket, offering a spacious operating area ideal for installing explosives and anchor rods.
Optional grouting function: For enhanced operational capability, the equipment includes an optional grouting system designed for rapid grouting operations post-anchor installation.
Less operating personnel: This advanced equipment significantly reduces manpower requirements, enabling the entire operation to be completed by just 3-4 individuals, compared to the traditional necessity of 8 or more workers.
Auxiliary function integration: Equipped with an integrated breaker hammer and welding machine, the trolley can efficiently perform under-excavation processing and welding tasks during arch installation.