Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent integrated arch frame trolley, LG312M, revolutionizes tunneling with seamless integration of processes such as measuring and placing points, under-excavation operations, arch frame installation, welding mesh, and connecting ribs. Designed for efficiency, it completes double-track tunnel excavations without needing to reposition the machine. Its robust engineering chassis, diesel-electric dual power systems, and two-way driving platform ensure superior driving performance, adapting to complex tunnel road conditions effortlessly. The arm frame's wireless and manual control operations allow precise, agile movement, delivering fast, efficient, energy-saving, and safe operations.
Equipment digitization (Optional): Our advanced digitization options include cluster management, precise positioning, video surveillance, reliable walkie-talkie, intelligent pre/alarm function, data management, BIM technology, digital twin modeling, comprehensive construction report management, tunnel contour scanning, and remote control capabilities.
Expandable hanging basket: The equipment features an expandable hanging basket, providing ample operating space ideal for installing explosives and anchor rods.
High efficiency: Innovatively designed with a three-arm, three-gripper, and three-basket structure, it boasts a middle arm lifting force of 3 tons. Adaptable to various construction methods, such as full-section, two-benching, and three-benching, it facilitates rapid setup in approximately an hour.
Installation of prefabricated arch frames: Employing our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, the arch frames are produced outside the tunnel. This approach dramatically reduces time required on hazardous surfaces, enhancing safety and efficiency.
Less operating personnel: With streamlined operations, a team of only 3-4 operators can complete tasks that traditionally required 8 or more, significantly reducing manpower needs.
Auxiliary function integration: The equipment is outfitted with a breaker hammer and welding machine, empowering it to perform under-excavation processing and welding operations seamlessly during arch installation.
Small overall size: Crafted with a lightweight design, the vehicle's compact size makes it perfectly suited for small-section construction conditions.
Transport dimensions (L × W × H) | 11800×3200×3200mm |
Total weight | 28t |
Engine power | 138.5kW |
Installed electrical power | 87.5kW |
Operating mode | Electric construction + diesel-powered emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 18×12.5m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (Dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 400mm |
Maximum grade | 32% |
Turning radius | 15m (two wheels) 8m (four wheels) |
Maximum speed | 25km/h |
Approach angle/departure angle | 17°/15° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.