The LG312K The LG312K Intelligent Arch Integrated Trolley is a pioneering solution that incorporates various complex processes, such as surveying and setting out, under-excavation operations, arch installation, mesh and connecting bar welding (optional), explosive charging, and more. This state-of-the-art system allows for seamless one-time excavation and arch installation within tunnels without needing to relocate the machinery. The vehicle’s engineering chassis, coupled with a dual diesel and electric power system, ensures exceptional performance with a compact body and flexible maneuverability. Its efficient traction makes it ideal for diverse and challenging tunnel environments. The boom can be effortlessly managed using wireless remote control or manual control, ensuring enhanced safety, speed, efficiency, and energy conservation.
Expandable Man Basket: Our equipment features an expandable man basket that offers a spacious operating area, accommodating 3-6 individuals. This versatile space is perfect for tasks such as loading explosives and anchoring rods, providing both convenience and operational efficiency.
High Efficiency: The innovative three-arm structure, equipped with three grippers and three hanging baskets, enables versatile construction methods including full sections, two-step, and three-step processes. Remarkably, the vertical frame's entire construction can be completed in about one hour, showcasing unparalleled efficiency.
Installation of Precast Arch: Our proprietary multi-frame precast arch technology (patent number ZL202022537953.5) significantly reduces both the duration and risk associated with working on hazardous construction faces. This advancement enhances overall construction efficiency, ensuring a safer and faster project completion.
Reduction in Number of Operators: With our advanced system, the entire construction operation can be efficiently conducted by just 3-4 people, a stark improvement over traditional methods that require at least 8 operators. This reduces labor costs and increases productivity.
Auxiliary Function Integration: The equipment comes equipped with a breaking hammer, allowing for under-excavation operations to commence immediately after arch installation, thereby streamlining the construction workflow.
Compact Overall Dimensions: Designed with a lightweight and compact structure, the vehicle is perfectly suited for small-section construction conditions, enhancing its adaptability and ease of use in confined spaces.
Advanced Equipment Informatization (Optional): Our system supports advanced functionalities like cluster management, precise positioning, video monitoring, interphone communication, pre-alarm functions, comprehensive data management, tunnel BIM technology, digital twin capabilities, construction report management, tunnel contour scanning, and remote control. These features collectively contribute to a highly informed and controlled construction environment.










