Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The LGM312N intelligent integrated arch anchor trolley boasts an engineering chassis equipped with a dual anchor system. With remarkable features like four-wheel steering, four-wheel drive, and two-way driving, it ensures superior maneuverability. The diesel-electric dual power system facilitates both electric construction and diesel-powered emergency operations. Its three-arm remote control is adept at prefabricated arch frame installation, various benching methods, and precise positioning adjustments. Furthermore, the arch frame adeptly manages under-excavation and welding operations during installation, offering exceptional flexibility in tunnel applications.
Functional integration: The intelligent integrated arch anchor trolley excels in combining multiple processes into one seamless operation. These include measuring and placing points, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, and optional anchor grouting, among many others.
Equipment digitization(Optional): This includes advanced features like cluster management, positioning function, video surveillance, walkie-talkie communication, pre/alarm function, data management, tunnel BIM technology, digital twin, and comprehensive construction report management.
Additionally, it offers tunnel contour scanning, remote control capabilities, and other state-of-the-art functionalities.
High efficiency: The trolley features a sophisticated three-arm, three-gripper, and three-basket structure, with the middle arm offering a maximum lifting force of 3 tons. The entire construction process is impressively completed within approximately one hour.
Installation of prefabricated arch frames: Our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques enable the production of arch frames outside the tunnel. This innovation reduces necessary working time on dangerous surfaces, minimizes construction safety risks, and significantly enhances overall efficiency.
Dual anchor system: The system's maximum drilling depth reaches an impressive 4.5 meters, with the left and right arm frames capable of performing feet locking, system anchoring, and advance anchoring operations simultaneously.
Rotating deployable hanging basket: Equipped with a rotating hanging basket, the trolley provides a larger operating space ideal for the installation of explosives and anchor rods.
Optional grouting function: An optional grouting system allows for swift grouting operations following the installation of anchors, enhancing the speed and efficiency of construction activities.
Less operating personnel: The entire construction operation is streamlined to require only 3-4 personnel, a significant reduction from the traditional requirement of 8 or more persons.
Auxiliary function integration: The trolley includes a breaker hammer and welding machine, capable of performing under-excavation processing and welding operations during arch installation, further enhancing its functionality.
Transport dimensions (L × W × H) | 11360×3665×3355mm |
Total weight | 38t |
Engine power | 138.5kW (National IV) |
Installed electrical power | 159kW |
Operating mode | Electric construction + diesel-powered walking and emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 17×12m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 380mm |
Maximum grade | 36% |
Turning radius | 15m (two wheels)/ 8m (four wheels) |
Maximum speed | 15km/h |
Approach angle/departure angle | 15.4°/15.7° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Advance beam | 5590mm(6200/4990mm) |
Drill Pipe | 4305mm(4915/3700mm) |
Maximum drilling depth | 4m(4.6m/3.4m) |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.98m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 16m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
Grouting system |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.