Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N Our LGM312N intelligent integrated arch anchor trolley boasts an advanced engineering chassis complemented by a sophisticated dual anchor system. Enjoy the seamless performance of four-wheel steering and drive, enhanced by two-way driving capabilities. The robust diesel-electric dual power system ensures efficient electric construction alongside reliable diesel-powered emergency operations. With a versatile three-arm remote control, this machine excels at installing prefabricated arch frames, executing varied benching methods, and precisely adjusting arch frame positions. The highly adaptable arch frame tackles under-excavation and welding operations effortlessly, making it an exceptionally flexible solution for tunnel work.
Functional integration: The intelligent integrated arch anchor trolley masterfully consolidates multiple processes into a single, cohesive operation. Capabilities include measuring and placing points, conducting under-excavation procedures, installing arch frames and anchor nets, providing advance support, executing system anchor constructions, and optional anchor grouting. This multifunctional approach streamlines workflows and boosts efficiency across the board.
Equipment digitization(Optional): Our advanced trolley includes cutting-edge features such as cluster management, precise positioning, comprehensive video surveillance, walkie-talkie communication, pre/alarm functions, data management, tunnel BIM technology, digital twin capabilities, and detailed construction reporting.
management, tunnel contour scanning, remote control and a myriad of other state-of-the-art functions.
High efficiency: Designed with a three-arm, three-gripper, and three-basket structure, the LGM312N ensures maximum lifting efficiency, with the middle arm capable of lifting up to 3 tons. Completing the entire construction process in approximately an hour, this equipment stands as a paragon of efficiency and performance.
Installation of prefabricated arch frames: Our patented multi-frame prefabricated segmented assembly and folding techniques enable the production of arch frames outside the tunnel, drastically reducing on-site working time and safety risks. This innovative approach significantly enhances overall construction efficiency.
Dual anchor system: The dual anchor system features a maximum drilling depth of 4.5m. Both the left and right arm frames are adept at performing feet locking, system anchoring, and advance anchoring operations simultaneously, ensuring robust and secure installations.
Rotating deployable hanging basket: Equipped with a spacious rotating hanging basket, our trolley offers ample operating space, ideal for the installation of explosives and anchor rods.
Optional grouting function: An optional grouting system allows for rapid grouting operations post-anchor installation, enhancing the overall efficiency and effectiveness of the construction process.
Less operating personnel: Requiring only 3-4 operators to complete the entire construction operation, our intelligent trolley significantly reduces the manpower needed, compared to traditional methods that require 8 or more personnel.
Auxiliary function integration: Integrated with a breaker hammer and welding machine, the equipment is fully capable of under-excavation processing and welding operations during the arch installation, providing comprehensive support for complex construction needs.