Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The intelligent, integrated, vehicle-mounted LCG312C arch frame trolley is a pioneering device that seamlessly combines steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement. Using a versatile vehicle chassis, it ensures flexible movement, smooth transitions, and timely emergency responses. This equipment performs reliably and efficiently in any setting. All three booms are remotely operable, and both the left and right booms can be manually controlled from the hanging basket. This automation reduces labor costs, minimizes construction risks, boosts efficiency, and standardizes the vertical arch installation process, moving towards factory-level precision.
Equipment Digitization (Optional): Our cutting-edge digital features include cluster management, positioning, video surveillance, intercom, pre/alarm functions, data management, tunnel BIM technology, and digital twin capabilities. Additionally, it offers construction report management, tunnel contour scanning, remote control, and more.
High Efficiency: Equipped with three arms and three grippers, alongside a multi-degree-of-freedom manipulator, the LCG312C boasts a maximum single-arm lifting force of 1.5 tons. It adeptly handles prefabricated arch installations, diverse benching method operations, and precise positioning and adjustments. Completing all vertical support construction tasks in approximately one hour, it redefines efficiency.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we produce arch frames outside the tunnel. This significantly reduces working hours on hazardous surfaces, enhances construction safety, and dramatically boosts overall efficiency.
Reduced Operating Personnel: The entire construction process requires only 3 operators, a stark contrast to the traditional requirement of 8 or more, showcasing our commitment to efficiency and workforce optimization.
Additional Options: Customize your equipment with optional features tailored to your operational needs: electric drive for hydraulic systems, breakers for under-excavation tasks, electric welding machines, and more.