Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent integrated arch frame trolley, LG312M, masterfully integrates multiple processes such as measuring and placing points, under-excavation operations, arch frame installation, welding mesh, and connecting ribs. During the one-time excavation of a double-track tunnel, the arch frame installation can be seamlessly completed without the need to move the machine. The entire vehicle is built on an engineering chassis, boasts diesel-electric dual power systems, and features a two-way driving platform structure. This innovative machine offers exceptional driving performance, ensuring adaptability to various complex tunnel road conditions. The arm frame utilizes both wireless remote control and manual control operations, allowing for precise and effortless control of the robotic arm. It stands out for its speed, efficiency, energy-saving capabilities, and safety.
Equipment Digitization (Optional): This feature includes cluster management, positioning function, video surveillance, walkie-talkie function, pre/alarm function, data management function, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control, and other advanced functionalities.
Expandable Hanging Basket: The equipment is fitted with an expandable hanging basket, providing a larger operating space ideal for installing explosives and anchor rods.
High Efficiency: Featuring a three-arm, three-gripper, and three-basket structure, the maximum lifting force of the middle arm is a robust 3 tons. It supports various construction methods, including full-section, two-benching, and three-benching. The entire setup can be accomplished in roughly an hour, greatly enhancing efficiency.
Installation of Prefabricated Arch Frames: Utilizing our company's patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, arch frames are produced outside the tunnel. This innovative approach significantly reduces the time required to work on dangerous surfaces, lowers construction safety risks, and substantially boosts overall efficiency.
Reduced Operating Personnel: Traditionally requiring 8 or more personnel, the entire construction operation can now be efficiently managed by just 3-4 people.
Auxiliary Function Integration: The equipment is equipped with a breaker hammer and welding machine, enabling under-excavation processing and welding operations during arch installation.
Compact Design: With its lightweight design and compact size, the vehicle is perfectly suited for small-section construction conditions.
Transport dimensions (L × W × H) | 11800×3200×3200mm |
Total weight | 28t |
Engine power | 138.5kW |
Installed electrical power | 87.5kW |
Operating mode | Electric construction + diesel-powered emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 18×12.5m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (Dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 400mm |
Maximum grade | 32% |
Turning radius | 15m (two wheels) 8m (four wheels) |
Maximum speed | 25km/h |
Approach angle/departure angle | 17°/15° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.