Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a state-of-the-art device designed to revolutionize tunnel construction. It seamlessly integrates steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement, providing unparalleled efficiency and reliability. Mounted on a versatile vehicle chassis, it ensures exceptional mobility, making it perfect for flexible movement, quick transitions, and emergency situations. With remote operation for all three booms and manual control for the left and right booms from the hanging basket, it significantly reduces labor costs, minimizes construction risks, enhances efficiency, and promotes standardized, factory-style tunnel arch construction.
Equipment Digitization (Optional): Our advanced digitization package includes cutting-edge features such as cluster management, precise positioning functions, comprehensive video surveillance, intercom capabilities, pre/alarm notifications, data management, tunnel BIM technology, digital twin integration, detailed construction report management, tunnel contour scanning, and seamless remote control functionalities.
High Efficiency: Equipped with three robust arms and three versatile grippers, along with a multi-degree-of-freedom manipulator, this equipment provides a maximum lifting force of 1.5 tons per arm. It effortlessly meets the demands for prefabricated arch installation, various benching method operations, and precise arch positioning and adjustment. Impressively, all construction procedures for vertical support are completed in just about an hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5), our equipment allows for the production of arch frames outside the tunnel. This innovative method significantly reduces working time on hazardous surfaces and construction safety risks, while substantially enhancing overall efficiency.
Less Operating Personnel: Our streamlined construction process requires only 3 personnel to complete the entire operation, in stark contrast to traditional methods that necessitate 8 or more workers.
Additional Options: Depending on your specific project needs, optional features can be incorporated, including an electric drive for hydraulic systems, a breaker for under-excavation operations, and electric welding machines, among others.