Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a state-of-the-art device ingeniously designed to seamlessly integrate steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Mounted on a versatile vehicle chassis, it ensures unmatched flexibility, smooth transitions, and emergency responsiveness. This sophisticated equipment can reliably and efficiently perform tasks in any setting. All three booms can be operated remotely, while the left and right booms offer manual control from the hanging basket, significantly reducing labor costs, minimizing construction risks, enhancing efficiency, and promoting the standardization and factoryization of tunnel vertical arches.
Optional Equipment Digitization: Our advanced digitization options include cutting-edge cluster management, precise positioning functions, comprehensive video surveillance, effective intercom functions, pre/alarm functionalities, robust data management, sophisticated tunnel BIM technology, and digital twin capabilities. Additionally, you can manage construction reports, conduct tunnel contour scanning, and utilize remote control and other state-of-the-art features.
Unparalleled Efficiency: Equipped with three arms and three grippers, along with a multi-degree-of-freedom manipulator, the LCG312C boasts an impressive maximum lifting force of 1.5 tons per arm. This meets the demands of prefabricated arch installation, various benching method operations, and precise positioning and adjustment of the arch. Remarkably, all construction procedures for vertical support can be completed within approximately one hour.
Efficient Installation of Prefabricated Arch Frames: Utilizing our company's patented multi-frame prefabricated segmented assembly installation techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), the arch frames are produced outside the tunnel. This innovative approach drastically reduces working time on hazardous surfaces, enhances construction safety, and significantly boosts overall efficiency.
Minimal Operating Personnel: With our cutting-edge LCG312C, the entire construction operation can be efficiently completed by just three people, in stark contrast to traditional methods that require eight or more personnel.
Additional Customizable Options: Tailored functions can be selected based on real-world conditions, including an electric drive for hydraulic systems, breakers for under-excavation operations, electric welding machines, and more.