Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent LG312M Integrated Arch Frame Trolley masterfully combines multiple complex processes into one seamless operation. It incorporates measuring and placing points, under-excavation operations, arch frame installation, welding mesh, and connecting ribs-all without moving the machine during the single excavation of a double-track tunnel. The system is designed on a robust engineering chassis and boasts a diesel-electric dual power system with a two-way driving platform structure, ensuring excellent adaptability to intricate tunnel road conditions. Its arm frame can be controlled via wireless remote or manual operations, offering simplified and accurate maneuverability. This state-of-the-art machine is fast, efficient, energy-conserving, and safe.
Equipment digitization (Optional): The digitization suite includes advanced features like cluster management, positioning function, video surveillance, walkie-talkie capability, pre/alarm function, data management, tunnel BIM technology and digital twin, construction report management, tunnel contour scanning, remote control, and other high-tech functionalities.
Expandable Hanging Basket: Our equipment is furnished with an expandable hanging basket, providing a spacious operating area ideal for installing explosives and anchor rods.
High Efficiency: This remarkable equipment features a three-arm, three-gripper, and three-basket structure. The central arm can lift up to 3 tons. It supports a variety of construction methods, including full-section, two-benching, and three-benching. Moreover, the entire setup can be completed in approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding techniques, the arch frames are prebuilt outside the tunnel. This significantly reduces the time spent on hazardous surfaces, minimizes construction safety risks, and substantially enhances overall efficiency.
Less Operating Personnel: The entire construction process can be efficiently managed by just 3-4 people, compared to traditional methods that require 8 or more personnel.
Auxiliary Function Integration: The equipment is equipped with an integrated breaker hammer and welding machine, facilitating under-excavation processing and welding operations during the arch installation.
Small Overall Size: Engineered with a lightweight design and compact structure, this vehicle is perfect for navigating small-section construction conditions.
Transport dimensions (L × W × H) | 11800×3200×3200mm |
Total weight | 28t |
Engine power | 138.5kW |
Installed electrical power | 87.5kW |
Operating mode | Electric construction + diesel-powered emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 18×12.5m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (Dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 400mm |
Maximum grade | 32% |
Turning radius | 15m (two wheels) 8m (four wheels) |
Maximum speed | 25km/h |
Approach angle/departure angle | 17°/15° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.