Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley, LGM312N, is a marvel of engineering excellence. Built on a solid engineering chassis, it boasts a dual anchor system, four-wheel steering, four-wheel drive, and bi-directional driving capabilities. The diesel-electric dual power system ensures seamless electric construction with a diesel-powered backup for emergencies. The sophisticated three-arm remote control allows for precise prefabricated arch frame installation, adaptable benching methods, and meticulous positioning adjustments. Designed to handle under-excavation and welding operations with remarkable flexibility, this trolley is a testament to innovation.
Functional integration: This intelligent arch anchor trolley integrates various essential processes into one efficient system. It encompasses measuring and placing points, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, optional anchor grouting, and many more functions.
Equipment digitization (Optional): Experience cutting-edge technology with optional features like cluster management, precise positioning, video surveillance, walkie-talkie functions, pre-alarm and alarm capabilities, comprehensive data management, tunnel BIM technology, digital twin integration, and detailed construction reports.
management, tunnel contour scanning, remote control, and a plethora of other functions.
High Efficiency: Sporting a robust three-arm, three-gripper, and three-basket structure, this trolley achieves a maximum middle arm lifting force of 3 tons. The entire construction process is impressively expedited, taking only about an hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding techniques, the arch frames are produced outside the tunnel. This method significantly reduces time spent on dangerous surfaces, enhances safety, and boosts overall efficiency.
Dual Anchor System: The dual anchor system achieves a drilling depth of up to 4.5 meters. The left and right arm frames simultaneously handle feet locking, system anchoring, and advance anchoring operations with unparalleled precision.
Rotating Deployable Hanging Basket: Outfitted with a rotating hanging basket, this equipment provides an expansive operating space ideal for installing explosives and anchor rods, enhancing operational versatility.
Optional Grouting Function: The optional grouting system ensures rapid and efficient grouting operations immediately after anchor installation, streamlining the workflow.
Reduced Operating Personnel: Efficiency is maximized as the entire operation can be completed by just 3-4 personnel, compared to the 8 or more required in traditional methods.
Auxiliary Function Integration: The equipment is equipped with a breaker hammer and welding machine, facilitating under-excavation processing and welding during arch installation. This integration enhances operational efficiency and versatility.