Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley embodies the pinnacle of modern mining technology. This innovative device seamlessly integrates steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Mounted on a robust vehicle chassis, it guarantees exceptional flexibility, effortless transitions, and prompt emergency responses. Its remarkable three-boom system can be remotely operated, with manual control available for the left and right booms from a secure hanging basket. This state-of-the-art equipment not only reduces labor costs and construction risks but also enhances efficiency, enabling the standardization and factoryization of tunnel vertical arches.
Equipment Digitization (Optional): Our advanced digitization options include cluster management, precise positioning, comprehensive video surveillance, intercom function, pre/alarm systems, data management, tunnel BIM technology, digital twin systems, detailed construction report management, tunnel contour scanning, and remote control capabilities.
High Efficiency: Equipped with three arms and three grippers, along with a highly versatile multi-degree-of-freedom manipulator, this equipment boasts a maximum lifting force of 1.5 tons per arm. It excels in prefabricated arch installation, various benching methods, and the precise positioning and adjustment of arches. Impressively, the entire vertical support construction process can be completed in approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our company's patented multi-frame prefabricated segmented assembly techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), the arch frames are pre-produced outside the tunnel. This significantly reduces the time required on hazardous surfaces, minimizes construction safety risks, and dramatically improves overall efficiency.
Reduced Operating Personnel: The entire construction operation can be efficiently managed by a team of just three people, a stark contrast to the traditional requirement of eight or more workers.
Additional Options: We offer a selection of customizable features based on your specific needs, including electric drives for hydraulic systems, breakers for under-excavation operations, electric welding machines, and more.