Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley, LGM312N, is a marvel of modern engineering. Built on a robust chassis, it features a dual anchor system and offers unparalleled maneuverability with its four-wheel steering, four-wheel drive, and bi-directional driving capabilities. Its diesel-electric dual power system ensures seamless electric operations for construction and reliable diesel-powered functionality in emergencies. The three-arm remote control is meticulously designed to handle prefabricated arch frame installations, adapt to various benching methods, and provide precise positioning adjustments. This versatile machine also supports under-excavation and welding operations, making it an indispensable tool for flexible tunnel construction.
Functional Integration: The LGM312N intelligently unites multiple construction processes into a single, cohesive system. From precise measuring and point placement to comprehensive under-excavation operations, arch frame installations, anchor net installations, and advanced support systems, it does it all. Optional features such as anchor grouting further enhance its capabilities.
Equipment Digitization (Optional): Enhance your operations with optional digitization features, including cluster management, precise positioning functions, comprehensive video surveillance, walkie-talkie communication, pre-alarm systems, and advanced data management. Incorporate tunnel BIM technology, digital twins, and detailed construction reports for unparalleled operational insight.
management, tunnel contour scanning, remote control, and a suite of other functions.
High Efficiency: Designed for speed and efficiency, the LGM312N features a three-arm, three-gripper, and three-basket structure, with the middle arm boasting a maximum lifting force of 3 tons. The entire construction process, from start to finish, can be completed in approximately one hour.
Installation of Prefabricated Arch Frames: Our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques allow for the production of arch frames outside the tunnel. This innovative approach minimizes time spent on hazardous surfaces, significantly improves safety, and enhances overall construction efficiency.
Dual Anchor System: With a maximum drilling depth of 4.5 meters, the LGM312N's left and right arm frames can simultaneously perform feet locking, system anchoring, and advanced anchoring operations, ensuring robust and secure construction.
Rotating Deployable Hanging Basket: Equipped with a rotating hanging basket, the LGM312N provides an expansive operating space ideal for the safe installation of explosives and anchor rods.
Optional Grouting Function: For projects requiring grouting, the LGM312N can be outfitted with an optional grouting system, enabling swift grouting operations immediately after anchor installation.
Less Operating Personnel: Efficiently designed, the LGM312N requires only 3-4 operators to complete the entire construction process, a significant reduction compared to traditional methods that necessitate 8 or more personnel.
Auxiliary Function Integration: The LGM312N is equipped with a breaker hammer and welding machine, enabling it to perform under-excavation processing and welding operations when installing the arch frame.