Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley, model LGM312N, epitomizes advanced engineering with its robust chassis and sophisticated dual anchor system. This state-of-the-art machine boasts four-wheel steering, four-wheel drive, and bi-directional driving capabilities. Its versatile diesel-electric dual power system ensures seamless electric construction and reliable diesel-powered emergency operations. The precision-engineered three-arm remote control facilitates efficient prefabricated arch frame installation, supports diverse benching methods, and enables exact positioning adjustments. Furthermore, the arch frame adeptly manages under-excavation and welding tasks, offering exceptional flexibility within tunnel environments.
Functional integration: The intelligent integrated arch anchor trolley seamlessly amalgamates multiple processes, such as precise measuring and placement, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, and optional anchor grouting, among others.
Equipment digitization (Optional): The optional digitization features encompass cluster management, advanced positioning functions, comprehensive video surveillance, walkie-talkie capabilities, pre-alarm functions, data management features, tunnel BIM technology, digital twin integration, and detailed construction reports.
management, tunnel contour scanning, remote control, and a suite of additional functionalities.
High efficiency: Highlighted by its three-arm, three-gripper, and three-basket configuration, the LGM312N's middle arm delivers a maximum lifting force of 3 tons. Remarkably, the entire construction cycle is completed within approximately one hour.
Installation of prefabricated arch frames: Leveraging our company's patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, the LGM312N produces arch frames externally to the tunnel. This innovation significantly reduces exposure to hazardous surfaces and enhances construction safety, markedly boosting operational efficiency.
Dual anchor system: With an impressive maximum drilling depth of 4.5 meters, the LGM312N's left and right arm frames can concurrently execute feet locking, system anchoring, and advance anchoring tasks.
Rotating deployable hanging basket: Equipped with a versatile rotating hanging basket, the LGM312N offers ample operating space, ideal for the installation of explosives and anchor rods.
Optional grouting function: The optional grouting system expedites grouting procedures post-anchor installation, ensuring rapid and effective operations.
Reduced manpower requirement: The streamlined construction process requires only 3-4 personnel, a stark reduction from the traditional need for 8 or more workers.
Auxiliary function integration: The LGM312N is equipped with a breaker hammer and welding machine, facilitating under-excavation processing and welding tasks during arch installation.