Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C Intelligent Integrated Vehicle-Mounted Arch Frame Trolley masterfully combines the installation of steel arch frames, welding mesh, connecting ribs, and excavation surface measurement into one seamless operation. With its advanced vehicle chassis, it ensures flexible movement, rapid transitions, and swift emergency responses. This remarkable equipment can perform dependably and efficiently in any scenario. Featuring three remotely operable booms, and additional manual control for the left and right booms in the hanging basket, it significantly reduces labor costs, mitigates construction risks, boosts efficiency, and achieves the standardization and factory-level precision of tunnel vertical arches.
Equipment Digitization (Optional): Enhance your operations with optional digitization features including cluster management, precise positioning, comprehensive video surveillance, efficient intercom functions, pre-emptive alarm systems, robust data management, cutting-edge tunnel BIM technology, digital twin integration, detailed construction report management, tunnel contour scanning, remote control, and more.
High Efficiency: Equipped with three arms and grippers, along with a multi-degree-of-freedom manipulator, the LCG312C delivers unparalleled lifting capabilities with a maximum single-arm lifting force of 1.5 tons. This power meets all requirements for prefabricated arch installation, various benching method operations, and precise positioning and adjustment of the arch. Impressively, the entire vertical support construction process can be completed in approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our company's patented multi-frame prefabricated segmented assembly installation techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), arch frames are produced outside the tunnel. This innovative method significantly reduces the working time on hazardous surfaces and minimizes construction safety risks, all while greatly enhancing overall efficiency.
Less Operating Personnel: The LCG312C revolutionizes tunnel construction by requiring only 3 operators to complete the entire process, compared to the traditional requirement of 8 or more personnel.
Additional Options: Tailor the LCG312C to your specific needs with a range of optional features. Choose from an electric drive for hydraulic systems, a breaker for under-excavation operations, an electric welding machine, and more, based on actual working conditions.