Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The Intelligent Integrated Vehicle-Mounted Arch Frame Trolley, model LCG312C, is a state-of-the-art device engineered for seamless installation of steel arch frames, welding mesh, connecting ribs, and precise excavation surface measurement. Mounted on a versatile vehicle chassis, this equipment ensures agile movement, easy transitions, and reliable performance in a myriad of scenarios. Featuring remote operation for all three booms and manual control for the left and right booms via the hanging basket, the LCG312C significantly reduces labor costs, enhances safety, boosts efficiency, and standardizes tunnel vertical arch construction.
Equipment Digitization (Optional): Includes advanced cluster management, precise positioning functions, real-time video surveillance, intercom capabilities, pre/alarm functions, comprehensive data management, cutting-edge tunnel BIM technology and digital twin integration, detailed construction report management, tunnel contour scanning, remote control, and a plethora of other high-tech functionalities.
High Efficiency: Equipped with three arms and three grippers, along with a highly versatile multi-degree-of-freedom manipulator, each arm boasts a maximum lifting force of 1.5 tons. This robust design meets the rigorous demands of prefabricated arch installations, various benching method operations, and precise positioning and adjustments of the arch. Remarkably, all vertical support construction procedures are completed within approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), the arch frames are produced outside the tunnel. This innovative approach drastically reduces working time on hazardous surfaces, minimizes construction safety risks, and substantially enhances overall efficiency.
Less Operating Personnel: Remarkably, the entire construction operation requires only 3 personnel, in stark contrast to the traditional requirement of 8 or more workers.
Additional Options: Based on actual conditions, a variety of optional features can be selected, including an electric drive for hydraulic systems, a breaker for under-excavation operations, an electric welding machine, and several other customizable functionalities.