Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The intelligent integrated vehicle-mounted arch frame trolley is a groundbreaking device that seamlessly combines steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Built on a robust vehicle chassis, this equipment guarantees unmatched flexibility, efficient transitions, and rapid responsiveness in any situation. With remote operation capabilities for all three booms, and manual control for the left and right booms from the hanging basket, it significantly reduces labor costs, lowers construction risks, boosts efficiency, and ensures standardized, factory-quality tunnel vertical arches.
Equipment Digitization (Optional): Enhanced digital features include cluster management, precise positioning, video surveillance, intercom capabilities, pre/alarm functions, comprehensive data management, advanced tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, remote control operations, and more.
High Efficiency: Featuring three arms and three grippers, alongside a highly versatile multi-degree-of-freedom manipulator, each arm boasts a maximum lifting force of 1.5 tons. This power meets the demanding requirements of prefabricated arch installation, various benching operations, and precise positioning and adjustment of the arch. Remarkably, all vertical support construction procedures can be completed in just one hour.
Installation of Prefabricated Arch Frames: Employing our patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we manufacture arch frames outside the tunnel. This strategic approach minimizes the time spent on hazardous surfaces, significantly reduces construction safety risks, and greatly enhances overall efficiency.
Reduced Operating Personnel: The entire construction operation requires just three personnel, a stark contrast to the eight or more needed for traditional methods.
Additional Options: Customizable functions include electric drives for hydraulic systems, breakers for under-excavation tasks, electric welding machines, and more, tailored to specific operational needs.