Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The intelligent, integrated vehicle-mounted arch frame trolley, LCG312C, revolutionizes mining tunnel operations by seamlessly combining steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Mounted on a vehicle chassis, it ensures unparalleled flexibility, facilitating smooth transitions and emergency responses. This versatile equipment operates efficiently in any setting, boasting remote operation for all three booms, while the left and right booms can also be manually controlled in a hanging basket. This reduces labor costs, minimizes construction risks, enhances efficiency, and standardizes tunnel vertical arch processes to a factory-grade precision.
Equipment Digitization (Optional): Embrace the future with our advanced digital features, including cluster management, precise positioning, video surveillance, intercom capabilities, pre-alarm and alarm functions, comprehensive data management, tunnel BIM technology, digital twin, detailed construction report management, tunnel contour scanning, remote control, and more.
High Efficiency: Equipped with three robust arms and grippers, along with a multi-degree-of-freedom manipulator, the LCG312C handles a maximum single-arm lifting force of 1.5 tons. It adeptly manages prefabricated arch installation, various benching operations, and precise arch positioning and adjustments. Impressively, the entire vertical support construction process is completed within an hour.
Installation of Prefabricated Arch Frames: Utilizing our company's patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5), arch frames are produced outside the tunnel. This method significantly reduces working time on hazardous surfaces, mitigates construction safety risks, and substantially boosts overall efficiency.
Reduced Operating Personnel: Streamline your operations with our innovative design, requiring only 3 personnel to complete the entire construction process, compared to the 8 or more needed for traditional methods.
Additional Options: Customize your experience with functional options tailored to real-world conditions, including electric drives for hydraulic systems, breakers for under-excavation tasks, electric welding machines, and more.