Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C Intelligent Integrated Vehicle-Mounted Arch Frame Trolley is an innovative solution engineered to revolutionize steel arch frame installation, welding mesh application, connecting ribs assembly, and excavation surface measurements. Mounted on a robust vehicle chassis, this versatile equipment offers unmatched mobility, seamless transitions, and reliable emergency responsiveness, guaranteeing efficient performance across diverse environments. The three booms are designed for remote operation, with additional manual control options for the left and right booms via a hanging basket, significantly reducing labor costs, minimizing construction risks, and boosting efficiency. This system ensures the standardization and industrialization of tunnel vertical arches, setting new benchmarks in the sector.
Equipment Digitization (Optional): This advanced equipment can be further enhanced with an array of optional digital features, including cluster management, precise positioning functions, real-time video surveillance, intercom capabilities, pre-warning and alarm systems, comprehensive data management, tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, and remote control functionalities.
High Efficiency: Featuring three arms and three grippers, along with a multi-degree-of-freedom manipulator, this equipment delivers exceptional lifting power with a single arm capable of handling up to 1.5 tons. It is perfectly suited for prefabricated arch installation, various benching method operations, and precise positioning and adjustment of arches. Remarkably, all vertical support construction procedures can be completed in approximately one hour, showcasing unparalleled efficiency.
Installation of Prefabricated Arch Frames: Our company's patented multi-frame prefabricated segmented assembly techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5) are employed to produce the arch frames outside the tunnel. This innovative approach significantly reduces the required working time on hazardous surfaces, mitigates construction safety risks, and greatly enhances overall efficiency.
Reduced Operating Personnel: Remarkably, the entire construction operation can be efficiently managed by just three personnel, as opposed to the conventional requirement of eight or more, marking a significant advancement in operational efficiency.
Additional Options: To tailor the equipment to specific operational needs, several optional features are available, including an electric drive for hydraulic systems, a breaker for under-excavation tasks, an electric welding machine, and more.