• Arch Frame Trolley for Integrated Mining Tunnel
  • Arch Frame Trolley for Integrated Mining Tunnel
  • Arch Frame Trolley for Integrated Mining Tunnel
  • Arch Frame Trolley for Integrated Mining Tunnel
  • Arch Frame Trolley for Integrated Mining Tunnel
  • Arch Frame Trolley for Integrated Mining Tunnel

Arch Frame Trolley for Integrated Mining Tunnel

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C The LCG312C Intelligent Integrated Vehicle-Mounted Arch Frame Trolley is an innovative solution engineered to revolutionize steel arch frame installation, welding mesh application, connecting ribs assembly, and excavation surface measurements. Mounted on a robust vehicle chassis, this versatile equipment offers unmatched mobility, seamless transitions, and reliable emergency responsiveness, guaranteeing efficient performance across diverse environments. The three booms are designed for remote operation, with additional manual control options for the left and right booms via a hanging basket, significantly reducing labor costs, minimizing construction risks, and boosting efficiency. This system ensures the standardization and industrialization of tunnel vertical arches, setting new benchmarks in the sector.

Equipment Digitization (Optional): This advanced equipment can be further enhanced with an array of optional digital features, including cluster management, precise positioning functions, real-time video surveillance, intercom capabilities, pre-warning and alarm systems, comprehensive data management, tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, and remote control functionalities.

High Efficiency: Featuring three arms and three grippers, along with a multi-degree-of-freedom manipulator, this equipment delivers exceptional lifting power with a single arm capable of handling up to 1.5 tons. It is perfectly suited for prefabricated arch installation, various benching method operations, and precise positioning and adjustment of arches. Remarkably, all vertical support construction procedures can be completed in approximately one hour, showcasing unparalleled efficiency.

Installation of Prefabricated Arch Frames: Our company's patented multi-frame prefabricated segmented assembly techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5) are employed to produce the arch frames outside the tunnel. This innovative approach significantly reduces the required working time on hazardous surfaces, mitigates construction safety risks, and greatly enhances overall efficiency.

Reduced Operating Personnel: Remarkably, the entire construction operation can be efficiently managed by just three personnel, as opposed to the conventional requirement of eight or more, marking a significant advancement in operational efficiency.

Additional Options: To tailor the equipment to specific operational needs, several optional features are available, including an electric drive for hydraulic systems, a breaker for under-excavation tasks, an electric welding machine, and more.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Arch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining TunnelArch Frame Trolley for Integrated Mining Tunnel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01