Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent Integrated Arch Cart with Smart Trolley Features, model LG312M, flawlessly integrates various crucial processes such as measuring and point placement, under-excavation operations, arch frame installation, welding mesh, and rib connections. Remarkably, the installation of arch frames during a single excavation of a double-track tunnel is accomplished without needing to relocate the machine. Featuring an engineering chassis, diesel-electric dual power systems, and a bi-directional driving platform, this machine is engineered to excel in diverse and complex tunnel road conditions. The arm frame is designed for both wireless remote and manual control, ensuring precise and effortless manipulation of the robotic arm, characterized by its speed, efficiency, energy-saving capabilities, and safety.
Equipment Digitization (Optional): Our advanced digitization features include cluster management, positioning functions, video surveillance, walkie-talkie functionality, pre-alarm/alarm systems, comprehensive data management, tunnel BIM technology, and digital twin technology. Additionally, it supports construction report management, tunnel contour scanning, remote control, and several other state-of-the-art functions.
Expandable Hanging Basket: This equipment is equipped with an expandable hanging basket, providing a larger operating space ideal for installing explosives and anchor rods, enhancing operational efficiency and safety.
High Efficiency: Our machine incorporates a three-arm, three-gripper, and three-basket structure, with the middle arm boasting a maximum lifting force of 3 tons. It supports versatile construction methods, including full-section, two-benching, and three-benching, and can be rapidly set up in approximately an hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding techniques, arch frames are produced outside the tunnel, significantly reducing working time on hazardous surfaces and enhancing construction safety. This innovation markedly improves overall efficiency.
Reduced Operating Personnel: This cutting-edge construction operation can be efficiently executed by just 3-4 people, a stark contrast to the 8 or more required for traditional methods.
Auxiliary Function Integration: This equipment features a breaker hammer and welding machine, enabling under-excavation processing and welding operations during the arch installation without additional tools.
Compact Overall Size: Designed to be lightweight and compact, this vehicle is highly adaptable to small-section construction conditions, ensuring versatility and ease of use.