Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a cutting-edge device that seamlessly integrates steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. This remarkable equipment is built on a robust vehicle chassis, ensuring swift mobility, seamless transition, and emergency readiness. It guarantees reliable and efficient performance in any situation. With the ability to remotely operate all three booms and manual control from the left and right booms in a hanging basket, this trolley significantly reduces labor costs, mitigates construction risks, and enhances efficiency. It promotes the standardization and factoryization of tunnel vertical arches.
Equipment Digitization (Optional): Our state-of-the-art digitization package includes advanced cluster management, precise positioning functionality, comprehensive video surveillance, efficient intercom capabilities, pre-alarm and alarm systems, sophisticated data management, integration with tunnel BIM technology and digital twin systems, thorough construction report management, tunnel contour scanning, and remote control functionalities.
High Efficiency: Our innovative design features three arms and three grippers, coupled with a multi-degree-of-freedom manipulator. Each arm boasts a maximum lifting force of 1.5 tons, adeptly handling prefabricated arch installations, diverse benching method operations, and precise positioning and adjustments of the arch. Impressively, all vertical support construction procedures are completed within approximately one hour.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly installation techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we manufacture the arch frames outside the tunnel, substantially reducing the time required on hazardous surfaces and minimizing construction safety risks, thereby significantly enhancing overall efficiency.
Less Operating Personnel: Revolutionizing traditional operations, our advanced system allows the entire construction process to be efficiently carried out by just three people, compared to the traditional eight or more.
Additional Options: Based on specific operational needs, various optional features are available, including an electric drive for hydraulic systems, a breaker for under-excavation operations, and an electric welding machine, among others.