Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley, LGM312N, incorporates an engineering chassis paired with a sophisticated dual anchor system. It boasts four-wheel steering, four-wheel drive, and bi-directional driving capabilities. Featuring a diesel-electric dual power system, it ensures seamless electric construction and diesel-powered emergency operations. Its advanced three-arm remote control facilitates prefabricated arch frame installation, versatile benching methods, and precise arch frame positioning. This system adeptly manages under-excavation and welding tasks during installation, offering exceptional flexibility within tunnel environments.
Functional Integration: The intelligent integrated arch anchor trolley seamlessly integrates multiple processes: measuring and placing points, under-excavation, arch frame installation, anchor net installation, advance support, system anchor construction, optional anchor grouting, and more, into a singular, highly efficient solution.
Equipment Digitization (Optional): This advanced system offers optional digitized features such as cluster management, precise positioning, video surveillance, walkie-talkie communication, pre-alarm functions, comprehensive data management, tunnel BIM technology, digital twin integration, construction reporting, tunnel contour scanning, and remote control capabilities.
management, tunnel contour scanning, remote control and other functions.
High Efficiency: Designed with a three-arm, three-gripper, and three-basket structure, the equipment's middle arm can lift up to 3 tons. The entire construction process is streamlined, taking approximately one hour to complete.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, prefabricated arch frames are produced outside the tunnel. This innovation reduces on-site working time on hazardous surfaces, minimizes construction safety risks, and significantly enhances overall efficiency.
Dual Anchor System: With a maximum drilling depth of 4.5m, the left and right arm frames execute feet locking, system anchoring, and advance anchoring operations simultaneously.
Rotating Deployable Hanging Basket: Equipped with a spacious rotating hanging basket, the system provides ample operating space for tasks such as installing explosives and anchor rods.
Optional Grouting Function: Featuring an optional grouting system, this equipment enables rapid grouting operations post-anchor installation.
Less Operating Personnel: The entire construction can be executed by just 3-4 personnel, drastically reducing the workforce compared to traditional methods requiring 8 or more.
Auxiliary Function Integration: This versatile equipment includes a breaker hammer and welding machine, proficient in under-excavation processing and welding during arch installation.