Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N: A Marvel of Engineering The intelligent integrated arch anchor trolley boasts an advanced engineering chassis coupled with a sophisticated dual anchor system. This cutting-edge machine provides four-wheel steering, four-wheel drive, and two-way driving capabilities. Powered by a dual diesel-electric system, it ensures seamless electric construction and reliable diesel-powered emergency operations. The three-arm remote control system enables the installation of prefabricated arch frames, supports various benching methods, and ensures precise positioning adjustments. Moreover, the arch frame facilitates under-excavation and welding operations with remarkable flexibility in tunnel installations.
Unparalleled Functional Integration: The intelligent integrated arch anchor trolley masterfully amalgamates numerous processes into a single system. This includes point measurement, under-excavation, arch frame installation, anchor net setup, advance support, system anchor construction, and optional anchor grouting, amongst many other functionalities.
Cutting-Edge Equipment Digitization (Optional): Features include cluster management, precise positioning, video surveillance, walkie-talkie communication, pre/alarm functions, comprehensive data management, tunnel BIM technology, digital twin capabilities, and detailed construction report management.
Additional functionalities encompass tunnel contour scanning and remote control operations.
Exceptional Efficiency: Designed with a robust three-arm, three-gripper, and three-basket structure, the central arm can lift up to 3 tons. The entire construction process is streamlined to take approximately one hour.
Innovative Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding arch frame techniques, arch frames are manufactured outside the tunnel. This significantly reduces time spent on hazardous surfaces, minimizes construction safety risks, and immensely boosts efficiency.
Advanced Dual Anchor System: Achieving a maximum drilling depth of 4.5m, the left and right arm frames can simultaneously perform feet locking, system anchoring, and advance anchoring operations.
Versatile Rotating Deployable Hanging Basket: Equipped with a rotating hanging basket providing ample operational space, ideal for installing explosives and anchor rods.
Optional Grouting Functionality: Featuring an optional grouting system, the equipment allows for rapid grouting operations post-anchor installation.
Reduced Manpower Requirements: The entire construction operation can be efficiently handled by merely 3-4 personnel, a significant reduction from the traditional requirement of 8 or more.
Integrated Auxiliary Functions: The equipment includes a breaker hammer and welding machine to facilitate under-excavation processing and welding operations during arch installation.
Transport dimensions (L × W × H) | 11360×3665×3355mm |
Total weight | 38t |
Engine power | 138.5kW (National IV) |
Installed electrical power | 159kW |
Operating mode | Electric construction + diesel-powered walking and emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 17×12m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 380mm |
Maximum grade | 36% |
Turning radius | 15m (two wheels)/ 8m (four wheels) |
Maximum speed | 15km/h |
Approach angle/departure angle | 15.4°/15.7° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Advance beam | 5590mm(6200/4990mm) |
Drill Pipe | 4305mm(4915/3700mm) |
Maximum drilling depth | 4m(4.6m/3.4m) |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.98m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 16m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
Grouting system |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.