Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the LG312M The remarkable LG312M intelligent integrated arch frame trolley is an engineering marvel that seamlessly combines multiple complex processes including precise measurement and point placement, efficient under-excavation operations, arch frame installation, welding mesh, and rib connections. This high-precision machinery allows for the installation of arch frames during a single excavation of a double-track tunnel without the need to relocate the equipment. Its robust design incorporates an advanced engineering chassis, dual diesel-electric power systems, and a bi-directional driving platform, ensuring exceptional performance across diverse and challenging tunnel conditions. The state-of-the-art arm frame operates effortlessly via wireless remote control and manual operation, providing swift, efficient, energy-saving, and safe maneuverability.
Optional Equipment Digitization: Enhance your operational capabilities with optional digitization features including cluster management, precise positioning, comprehensive video surveillance, integrated walkie-talkie function, pre-emptive/alarm systems, thorough data management, tunnel BIM technology and digital twin integration, detailed construction report management, accurate tunnel contour scanning, remote control, and more.
Versatile Expandable Hanging Basket: Equipped with an expandable hanging basket, this apparatus offers a spacious operational area, perfect for the installation of explosives and anchor rods, streamlining and enhancing operational efficiency.
Exceptional High Efficiency: Boasting a unique three-arm, three-gripper, and three-basket configuration, the LG312M delivers unparalleled efficiency. The middle arm can lift up to 3 tons, and the machine supports various construction methods including full-section, two-benching, and three-benching. The entire setup can be completed in approximately an hour, maximizing productivity.
Innovative Prefabricated Arch Frame Installation: Our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques allow for the production of arch frames outside the tunnel. This significantly reduces time spent on hazardous surfaces, minimizes construction safety risks, and dramatically enhances overall efficiency.
Reduced Staffing Requirements: This sophisticated machinery requires only 3-4 operators to complete the entire construction process, a significant reduction from the 8 or more personnel traditionally needed, thereby reducing labor costs and increasing operational efficiency.
Integrated Auxiliary Functions: The LG312M is equipped with a breaker hammer and welding machine, enabling under-excavation processing and welding operations during arch installation, integrating multiple functions into one streamlined process.
Compact and Agile Design: Engineered with a lightweight and compact design, this vehicle is perfectly suited for small-section construction environments, offering unmatched adaptability and ease of use.