• Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
  • Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
  • Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
  • Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
  • Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
  • Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer

Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer

Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition: New
Drill Hole Diameter: 41~102mm
Drill Hole Depth: 5.2m
Total Weight: 57t
Engine Power: 158kw
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
LZG413A
Installed Electrical Power
159kw
Operating Mode
Electric Construction + Diesel-Powered Emergency
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17.5×11m
Chassis Form
Operating Chassis
Driving Mode
Bidirectional Driving (Front and Rear Dual Cabs)
Driving and Steering Methods
Four-Wheel Drive, Four-Wheel Steering
Minimum Ground Clearance
370mm
Maximum Grade
36%
Turning Radius
16m (Two Wheels)/10m (Four Wheels)
Maximum Speed
15km/H
Approach Angle/Departure Angle
14°/14°
Transport Package
Nothing
Specification
14500× 3000× 3600mm
Trademark
LANHI
Origin
China

Product Description

Product Description
 
The LZG413A The intelligent integrated drilling and arch trolley LZG413A is a dual rock drilling and vertical arch integrated trolley designed to meet the diverse needs of tunnel full-section construction as well as the benching method. This groundbreaking machine boasts a rigid, integrated frame engineering chassis and dual rock drilling arms for unparalleled performance. Its standing arch frame features a dual arm design, complemented by three grippers and two expandable hanging baskets. Enjoy the versatility of four-wheel steering and drive, two-way driving, and support for both electric construction and diesel-powered emergency response. User-friendly and highly reliable, this machine delivers a low failure rate, a compact structure, and easy maintenance.
Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
Functional integration: Seamlessly integrate multiple functions including tunneling and anchor hole construction, arch frame installation, charging, anchor installation, anchor grouting (optional), and anchor net installation, among others.
Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
Wide range of applications: Capable of handling three-step, two-step, and full-section procedures, effectively meeting the rock drilling and arch construction requirements of various construction methods.
Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
Convenient operation: Employ a local console along with remote operation to achieve high viewing angles for rock drilling and close viewing angles for erecting arches, ensuring utmost precision and ease of use.
Equipment digitization (Optional): Features sophisticated digital solutions including cluster management, positioning function, video surveillance, walkie-talkie functionality, pre/alarm functions, data management, BIM technology integration, digital twin capabilities, construction report management, tunnel contour scanning, and remote control.
Rock drilling and vertical arching: Equipped with four operating arms, including two double-triangular self-balancing rock drilling arms and two vertical arch arms with three grippers. The arm support offers a maximum lifting force of 2.5 tons, perfectly suited for prefabricated arch frame installation and precise positioning adjustments. Complete the entire construction process in approximately 1 hour.
Double slip structure: Our proprietary double slip mechanism guarantees stable and swift slippage, enhancing overall performance.
Double hanging basket: Both the main and auxiliary vertical arch arms come with expandable hanging baskets. Following drilling, swiftly install anchor rods and auxiliary charges.
Grouting function: The optional grouting system enables rapid grouting operations post-anchor construction, enhancing efficiency.
Auxiliary functions: Outfit your operations with welding machines, power tools, and all necessary equipment to make construction seamless and more efficient.
Product Parameters
 
Transport dimensions (L × W × H)  14500×3000×3600mm
Total weight 57t
Engine power 158kW
Installed electrical power 159kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17.5×11m
Chassis form Operating chassis
Driving mode Bidirectional driving (front and rear dual cabs)
Driving and steering methods Four-wheel drive, four-wheel steering
Minimum ground clearance 370mm
Maximum grade 36%
Turning radius 16m (two wheels)/10m (four wheels)
Approach angle/departure angle 14°/14°
Arm support mode Skid
Arm support quantity 4
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 2.5t
Maximum lifting capacity of left and right arms 1.5t
Number of rock drills 2
Power of rock drills 18kW
Maximum drilling depth 5.2m
Drilling diameter Φ41~Φ102mm
Discharge volume 0.98m³/min
Discharge pressure 0.8MPa
Flow rate 16m³/h
Pressure 20bar
Welding machines 3 sets
Breaking hammers /
Grouting system 1 set
 
Detailed Photos

Lzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction ManufacturerLzg413A Advanced Dual Rock Drilling and Vertical Arch Trolley for Efficient Tunnel Construction Manufacturer
FAQ
 

1. What can you purchase from us?
Our flagship offerings encompass state-of-the-art solutions for underground engineering machinery and intelligent mining equipment. This impressive range features tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We are fully equipped to deliver comprehensive, all-in-one solution services tailored to our clients' needs.

2. What is the Minimum Order Quantity (MOQ)?
The Minimum Order Quantity (MOQ) is set at 1 set.

3. What payment terms are available?
We facilitate transactions via T/T with a requisite 50% prepayment.

4. What is the typical order lead time?
Our standard lead time is a streamlined 15 days.

5. Which logistics methods are available for shipping?
We offer an array of logistics methods, including truck delivery in Central Asia and Russia, alongside efficient rail and sea shipping options.

6. How punctual is your delivery time?
The delivery times are as follows: 15 to 20 days via China-Europe trains and approximately 2 to 3 months for sea shipping.

7. How robust are your customer service and after-sales service?
We pride ourselves on offering round-the-clock, 24/7 online support, coupled with dedicated after-sales services in Russia and Central Asia.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01