Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The intelligent Integrated Arch Cart with Smart Technology System revolutionizes tunnel construction by combining multiple processes, such as precise measuring, point placement, under-excavation operations, arch frame installation, mesh welding, and rib connection. Remarkably, it completes the installation of arch frames in double-track tunnels without repositioning. Mounted on an engineering chassis, it features a diesel-electric dual power system and a two-way driving platform, ensuring superior driving performance even in complex tunnel conditions. The arm frame, controlled via wireless remote and manual operation, allows for precise, efficient, and safe control of the robotic arm, making it an energy-saving and high-performance solution.
Equipment Digitization (Optional): This advanced system includes state-of-the-art features such as cluster management, positioning functions, video surveillance, walkie-talkie communications, pre-alarm functions, data management, tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, remote control, and other cutting-edge functionalities.
Expandable Hanging Basket: Equipped with an expandable hanging basket, this system offers a larger operating space ideal for the installation of explosives and anchor rods, enhancing both functionality and safety.
High Efficiency: The innovative three-arm, three-gripper, and three-basket structure allows for a maximum lifting force of 3 tons. It supports versatile construction methods including full-section, two-benching, and three-benching, with the entire setup completed in approximately one hour.
Installation of Prefabricated Arch Frames: Our patented techniques for producing multi-frame prefabricated segmented assembly and folding arch frames outside the tunnel significantly reduce time spent on dangerous surfaces, enhancing safety and greatly improving overall construction efficiency.
Less Operating Personnel: This highly efficient system allows the entire construction operation to be managed by just 3-4 people, significantly reducing manpower compared to traditional methods that require 8 or more operators.
Auxiliary Function Integration: Integrated with a breaker hammer and welding machine, this equipment can seamlessly perform under-excavation processing and welding operations during arch installation, enhancing operational efficiency.
Compact Design: The vehicle's lightweight and compact design make it exceptionally adaptable to small-section construction conditions, ensuring flexibility and ease of use.