• Vehicle-Mounted Arch Frame Trolley for Mining
  • Vehicle-Mounted Arch Frame Trolley for Mining
  • Vehicle-Mounted Arch Frame Trolley for Mining
  • Vehicle-Mounted Arch Frame Trolley for Mining
  • Vehicle-Mounted Arch Frame Trolley for Mining
  • Vehicle-Mounted Arch Frame Trolley for Mining

Vehicle-Mounted Arch Frame Trolley for Mining

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C The intelligent integrated vehicle-mounted arch frame trolley is an advanced device incorporating steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Built on a robust vehicle chassis, it ensures flexible movement, rapid transitions, and emergency adaptations, delivering reliable and efficient performance in any setting. The triple-boom system offers remote operation, with manual control options for the left and right booms from the hanging basket. This reduces labor costs, mitigates construction risks, enhances efficiency, and facilitates the standardization and factory-level precision of tunnel vertical arches.

Equipment digitization (Optional): This includes a suite of functionalities such as cluster management, positioning capability, video surveillance, intercom function, pre-alarm and alarm systems, data management, tunnel BIM technology, digital twins, construction report management, tunnel contour scanning, and remote control.

High Efficiency: Featuring three arms and three grippers alongside a multi-degree-of-freedom manipulator, each arm boasts a maximum lifting force of 1.5 tons. This configuration supports prefabricated arch installations, various benching operations, and precise arch positioning and adjustments. The entire vertical support construction process is completed within approximately one hour.

Installation of Prefabricated Arch Frames: Our patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5) allow for arch frame production outside the tunnel. This significantly reduces time spent on hazardous surfaces, boosts construction safety, and enhances overall efficiency.

Reduced Operating Personnel: The complete construction operation can be managed by just three personnel, compared to the traditional requirement of eight or more, optimizing workforce efficiency.

Additional Options: Based on specific requirements, selectable features include an electric drive for hydraulic systems, a breaker for under-excavation tasks, an electric welding machine, and more.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Vehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for MiningVehicle-Mounted Arch Frame Trolley for Mining

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01