Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley employs an engineering chassis paired with a dual anchor system. This cutting-edge machine boasts four-wheel steering, four-wheel drive, and dual-directional driving capabilities. Its versatile diesel-electric dual power system ensures seamless electric construction while providing diesel-powered emergency operations. The innovative three-arm remote control system is engineered to meet the demands of prefabricated arch frame installations, diverse benching methods, and precision positioning adjustments of the arch frame. Capable of handling under-excavation and welding operations during installation, this trolley offers unparalleled flexibility within the tunnel environment.
Functional Integration: The intelligent integrated arch anchor trolley masterfully combines numerous processes into one seamless operation. This includes precise measuring and placing points, efficient under-excavation operations, flawless arch frame installations, sturdy anchor net installations, robust advance support, system anchor construction, and optional anchor grouting, among an array of other functionalities.
Equipment Digitization (Optional): Includes advanced cluster management, precise positioning functions, comprehensive video surveillance, reliable walkie-talkie communications, proactive pre/alarm functions, sophisticated data management, cutting-edge tunnel BIM technology and digital twin capabilities, detailed construction reports, tunnel contour scanning, and efficient remote control operations.
management, tunnel contour scanning, remote control and other functions.
High Efficiency: Equipped with a three-arm, three-gripper, and three-basket structure, the trolley ensures high productivity. The middle arm delivers a formidable maximum lifting force of 3 tons, and the overall construction process is impressively completed within approximately an hour.
Installation of Prefabricated Arch Frames: Our patented multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation techniques excel at producing arch frames outside the tunnel. This innovative approach significantly reduces the working time on hazardous surfaces, enhances construction safety, and substantially boosts overall efficiency.
Dual Anchor System: With a maximum drilling depth of 4.5 meters, the left and right arm frames operate in tandem to perform feet locking, system anchoring, and advance anchoring operations, ensuring stability and reliability.
Rotating Deployable Hanging Basket: This equipment features a rotating hanging basket designed with an expansive operating space, ideal for the installation of explosives and anchor rods, facilitating versatile and safe operations.
Optional Grouting Function: Equipped with an optional grouting system, this versatile machine enables swift and efficient grouting operations post-anchor installation, enhancing the overall construction process.
Reduced Operating Personnel: The comprehensive construction operation can be efficiently handled by a team of just 3-4 personnel, a marked improvement over traditional methods that require 8 or more individuals.
Auxiliary Function Integration: The equipment is fully equipped with a breaker hammer and welding machine, capable of performing under-excavation processing and welding tasks during arch installation, thus enhancing operational efficiency and versatility.
Transport dimensions (L × W × H) | 11360×3665×3355mm |
Total weight | 38t |
Engine power | 138.5kW (National IV) |
Installed electrical power | 159kW |
Operating mode | Electric construction + diesel-powered walking and emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 17×12m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 380mm |
Maximum grade | 36% |
Turning radius | 15m (two wheels)/ 8m (four wheels) |
Maximum speed | 15km/h |
Approach angle/departure angle | 15.4°/15.7° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Advance beam | 5590mm(6200/4990mm) |
Drill Pipe | 4305mm(4915/3700mm) |
Maximum drilling depth | 4m(4.6m/3.4m) |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.98m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 16m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
Grouting system |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.