The LZG413A Step into the future of tunneling with the LZG413A Intelligent Integrated Drilling and Arch Trolley. This state-of-the-art machine is engineered to meet the demands of full-section tunnel construction and benching methods. Featuring a robust integrated frame engineering chassis and dual rock drilling arms, it ensures precision and efficiency. The standing arch frame boasts a dual-arm design, accompanied by three grippers and two expandable hanging baskets. With four-wheel steering, four-wheel drive, and bidirectional mobility, this trolley excels in electric construction and diesel-powered emergency scenarios. Its user-friendly interface, low failure rate, exceptional reliability, compact build, and easy maintenance make it an indispensable tool for modern construction.
Functional Integration: Experience unparalleled multi-functionality with our system, catering to tasks such as tunneling, anchor hole construction, arch frame installation, charging, anchor installation, anchor grouting (optional), and anchor net installation.
Wide Range of Applications: Our solution supports three-step, two-step, and full-section methods, adeptly fulfilling the rock drilling and arch construction requirements of diverse construction methodologies.
Convenient Operation: Featuring both a local console and remote operation capabilities, our system allows for high-angle views during rock drilling and close-range views during arch erection, ensuring optimal visibility and control.
Equipment Digitization (Optional): Unlock advanced functionalities with our optional digitization package, including cluster management, positioning, video surveillance, walkie-talkie, pre/alarm, data management, BIM technology, digital twin, construction reporting, tunnel contour scanning, remote control, and more.
Rock Drilling and Vertical Arching: Equipped with four operational arms-two double-triangular self-balancing rock drilling arms, two vertical arch arms-and three grippers, our system boasts a maximum arm support lifting force of 2.5 tons. This ensures seamless installation of prefabricated arch frames with precise positioning. Complete your construction process in approximately one hour.
Double Slip Structure: Our proprietary double-slip mechanism guarantees stable and rapid slippage, enhancing performance and reducing downtime.
Double Hanging Basket: Both the main and auxiliary vertical arch arms feature expandable hanging baskets, facilitating the installation of anchor rods and auxiliary charges post-drilling.
Grouting Function: The optional grouting system enables rapid grouting operations immediately after anchor construction, speeding up project timelines.
Auxiliary Functions: Our system is equipped with welding machines, power tools, and other essential equipment, significantly improving construction efficiency and productivity.
Transport dimensions (L × W × H) |
14500×3000×3600mm |
Total weight |
57t |
Engine power |
158kW |
Installed electrical power |
159kW |
Operating mode |
Electric construction + diesel-powered emergency |
Control mode |
Wireless remote control + manual control |
Operating voltage |
380V |
Operating range (width × height) |
17.5×11m |
Chassis form |
Operating chassis |
Driving mode |
Bidirectional driving (front and rear dual cabs) |
Driving and steering methods |
Four-wheel drive, four-wheel steering |
Minimum ground clearance |
370mm |
Maximum grade |
36% |
Turning radius |
16m (two wheels)/10m (four wheels) |
Approach angle/departure angle |
14°/14° |
Arm support mode |
Skid |
Arm support quantity |
4 |
Hanging basket mode |
Expandable |
Number of hanging baskets |
2 |
Number of grippers |
3 |
Maximum lifting capacity of middle arm |
2.5t |
Maximum lifting capacity of left and right arms |
1.5t |
Number of rock drills |
2 |
Power of rock drills |
18kW |
Maximum drilling depth |
5.2m |
Drilling diameter |
Φ41~Φ102mm |
Discharge volume |
0.98m³/min |
Discharge pressure |
0.8MPa |
Flow rate |
16m³/h |
Pressure |
20bar |
Welding machines |
3 sets |
Breaking hammers |
/ |
Grouting system |
1 set |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.