• High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
  • High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
  • High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
  • High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
  • High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
  • High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons

High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons

After-sales Service: 6 Month
Warranty: 6 Month
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition: New
Drill Hole Diameter: 41~102mm
Drill Hole Depth: 5.2m
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
LZG413A
Total Weight
57t
Engine Power
158kw
Installed Electrical Power
159kw
Operating Mode
Electric Construction + Diesel-Powered Emergency
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17.5×11m
Chassis Form
Operating Chassis
Driving Mode
Bidirectional Driving (Front and Rear Dual Cabs)
Driving and Steering Methods
Four-Wheel Drive, Four-Wheel Steering
Minimum Ground Clearance
370mm
Maximum Grade
36%
Turning Radius
16m (Two Wheels)/10m (Four Wheels)
Maximum Speed
15km/H
Approach Angle/Departure Angle
14°/14°
Transport Package
Nothing
Specification
14500× 3000× 3600mm
Trademark
LANHI
Origin
China

Product Description

Product Description
 
The LZG413A Step into the future of tunneling with the LZG413A Intelligent Integrated Drilling and Arch Trolley. This state-of-the-art machine is engineered to meet the demands of full-section tunnel construction and benching methods. Featuring a robust integrated frame engineering chassis and dual rock drilling arms, it ensures precision and efficiency. The standing arch frame boasts a dual-arm design, accompanied by three grippers and two expandable hanging baskets. With four-wheel steering, four-wheel drive, and bidirectional mobility, this trolley excels in electric construction and diesel-powered emergency scenarios. Its user-friendly interface, low failure rate, exceptional reliability, compact build, and easy maintenance make it an indispensable tool for modern construction.
High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
Functional Integration: Experience unparalleled multi-functionality with our system, catering to tasks such as tunneling, anchor hole construction, arch frame installation, charging, anchor installation, anchor grouting (optional), and anchor net installation.
High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
Wide Range of Applications: Our solution supports three-step, two-step, and full-section methods, adeptly fulfilling the rock drilling and arch construction requirements of diverse construction methodologies.
High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
Convenient Operation: Featuring both a local console and remote operation capabilities, our system allows for high-angle views during rock drilling and close-range views during arch erection, ensuring optimal visibility and control.
Equipment Digitization (Optional): Unlock advanced functionalities with our optional digitization package, including cluster management, positioning, video surveillance, walkie-talkie, pre/alarm, data management, BIM technology, digital twin, construction reporting, tunnel contour scanning, remote control, and more.
Rock Drilling and Vertical Arching: Equipped with four operational arms-two double-triangular self-balancing rock drilling arms, two vertical arch arms-and three grippers, our system boasts a maximum arm support lifting force of 2.5 tons. This ensures seamless installation of prefabricated arch frames with precise positioning. Complete your construction process in approximately one hour.
Double Slip Structure: Our proprietary double-slip mechanism guarantees stable and rapid slippage, enhancing performance and reducing downtime.
Double Hanging Basket: Both the main and auxiliary vertical arch arms feature expandable hanging baskets, facilitating the installation of anchor rods and auxiliary charges post-drilling.
Grouting Function: The optional grouting system enables rapid grouting operations immediately after anchor construction, speeding up project timelines.
Auxiliary Functions: Our system is equipped with welding machines, power tools, and other essential equipment, significantly improving construction efficiency and productivity.
Product Parameters
 
Transport dimensions (L × W × H)  14500×3000×3600mm
Total weight 57t
Engine power 158kW
Installed electrical power 159kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17.5×11m
Chassis form Operating chassis
Driving mode Bidirectional driving (front and rear dual cabs)
Driving and steering methods Four-wheel drive, four-wheel steering
Minimum ground clearance 370mm
Maximum grade 36%
Turning radius 16m (two wheels)/10m (four wheels)
Approach angle/departure angle 14°/14°
Arm support mode Skid
Arm support quantity 4
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 2.5t
Maximum lifting capacity of left and right arms 1.5t
Number of rock drills 2
Power of rock drills 18kW
Maximum drilling depth 5.2m
Drilling diameter Φ41~Φ102mm
Discharge volume 0.98m³/min
Discharge pressure 0.8MPa
Flow rate 16m³/h
Pressure 20bar
Welding machines 3 sets
Breaking hammers /
Grouting system 1 set
 
Detailed Photos

High-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 TonsHigh-Performance Engineering-Drilling-Rig Drilling Trolley with Two Vertical Arch and Three Grippers Arms Maximum Arm Lifting Force of 2.5 Tons
FAQ
 

1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.

2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.

3,What payment terms do you accept?
We accept T/T with a 50% prepayment.

4,What about the order lead time?
The usual lead time is 15 days.

5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.

6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.

7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01