• Arch Frame Trolley for Mining Tunnel Operations
  • Arch Frame Trolley for Mining Tunnel Operations
  • Arch Frame Trolley for Mining Tunnel Operations
  • Arch Frame Trolley for Mining Tunnel Operations
  • Arch Frame Trolley for Mining Tunnel Operations
  • Arch Frame Trolley for Mining Tunnel Operations

Arch Frame Trolley for Mining Tunnel Operations

After-sales Service: 6 Month
Warranty: 6 Month
Total Weight: 30t
Engine Power: 176kw
Installed Electrical Power: 80kw
Operating Mode: Electric Construction + Diesel-Powered Emergency
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Sichuan, China
to see all verified strength labels (24)
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
LCG312C
Control Mode
Wireless Remote Control + Manual Control
Operating Voltage
380V
Operating Range (Width × Height)
17×11m
Chassis Form
Vehicle-Mounted Chassis
Driving Mode
One-Way Driving
Driving and Steering Methods
Front Wheel Steering, Rear Four-Wheel Drive
Minimum Ground Clearance
320mm
Maximum Grade
40%
Turning Radius
9.5m (Two Wheels)
Maximum Speed
50km/H
Approach Angle/Departure Angle
25°/16°
Transport Package
Nothing
Specification
10500*2800*3800mm
Trademark
LANHI
Origin
China

Product Description

Product Description

The LCG312C Discover the LCG312C, an intelligent integrated vehicle-mounted arch frame trolley that revolutionizes tunnel construction. This cutting-edge device seamlessly integrates steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Designed with a versatile vehicle chassis, it ensures smooth mobility, effortless transitions, and rapid emergency responses. Operate all three booms remotely, while the left and right booms offer manual control via a hanging basket, significantly reducing labor costs and construction risks. Boost efficiency, standardize processes, and achieve factory-level tunnel vertical arches with this remarkable equipment.

Equipment Digitization (Optional): Unlock a suite of advanced digital features including cluster management, precise positioning, video surveillance, intercom functions, pre/alarm system, comprehensive data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control capabilities, and more.

High Efficiency: Experience unmatched efficiency with three arms and grippers, complemented by a multi-degree-of-freedom manipulator. Each arm boasts a maximum lifting force of 1.5 tons, perfectly suited for prefabricated arch installations, various benching methods, and precise arch positioning. Complete vertical support construction tasks in just about an hour, redefining productivity standards.

Installation of Prefabricated Arch Frames: Utilize our patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5) to construct arch frames outside the tunnel. This innovative method minimizes working time on hazardous surfaces, drastically reduces construction safety risks, and significantly enhances overall efficiency.

Minimal Operating Personnel: Complete the entire construction operation with just 3 personnel, a stark contrast to traditional methods that require 8 or more workers.

Additional Options: Tailor the equipment to your specific needs with optional features such as electric drives for hydraulic systems, breakers for under-excavation operations, electric welding machines, and more.

Product Parameters

Transport dimensions (L × W × H) 10500*2800*3800mm
Total weight 30t
Engine power 176kW
Installed electrical power 80kW
Operating mode Electric construction + diesel-powered emergency
Control mode Wireless remote control + manual control
Operating voltage 380V
Operating range (width × height) 17×11m
Chassis form Vehicle-mounted chassis
Driving mode One-way driving
Driving and steering methods Front wheel steering, rear four-wheel drive
Minimum ground clearance 320mm
Maximum grade 40%
Turning radius 9.5m (two wheels)
Maximum speed 50km/h
Approach angle/departure angle 25°/16°
Arm support mode Two stage telescopic
Arm support quantity 3
Hanging basket mode Expandable
Number of hanging baskets 2
Number of grippers 3
Maximum lifting capacity of middle arm 1.5t
Maximum lifting capacity of left and right arms 1.5t
Welding machines 3 sets
Breaking hammers /
Three remote controls/one remote control Diesel Power
Breaker Combustible Gas Detector
Elect ic Welding Machine Hole cleaning device
Middle arm bearing capacity of 3t      

Detailed Photos

Arch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel OperationsArch Frame Trolley for Mining Tunnel Operations

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
385
Year of Establishment
2011-11-01