Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The intelligent integrated arch anchor trolley boasts an advanced engineering chassis and a dual anchor system. This cutting-edge machine features four-wheel steering, four-wheel drive, and two-way driving capabilities. Its diesel-electric power system supports both electric construction and emergency diesel operations. Equipped with a three-arm remote control, it excels in prefabricated arch frame installations, various benching methods, and precise positioning adjustments. The arch frame handles under-excavation and welding operations effortlessly, while its design ensures exceptional flexibility within the tunnel.
Functional Integration: The intelligent integrated arch anchor trolley masterfully combines multiple processes into a singular, efficient operation. This includes tasks such as measuring and placing points, under-excavation, arch frame installation, anchor net installation, advance support, system anchor construction, optional anchor grouting, and more.
Equipment Digitization (Optional): Enhance your operations with features like cluster management, precise positioning, video surveillance, walkie-talkie integration, pre-alarm functionality, comprehensive data management, tunnel BIM technology, digital twin, detailed construction reporting,
tunnel contour scanning, remote control, and a host of other advanced functions.
High Efficiency: Built with a three-arm, three-gripper, and three-basket structure, the middle arm's maximum lifting force reaches 3 tons. The entire construction process is streamlined to take just about an hour.
Installation of Prefabricated Arch Frames: Our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques create arch frames outside the tunnel. This significantly reduces working time on hazardous surfaces, enhancing construction safety and overall efficiency.
Dual Anchor System: The system's maximum drilling depth extends to 4.5 meters, with left and right arm frames capable of feet locking, system anchoring, and advance anchoring operations simultaneously.
Rotating Deployable Hanging Basket: Equipped with a rotating hanging basket, this feature provides a larger operating space ideal for installing explosives and anchor rods.
Optional Grouting Function: The optional grouting system enables rapid grouting operations post-anchor installation, ensuring seamless efficiency.
Reduced Operating Personnel: Complete the entire construction operation with just 3-4 people, compared to the traditional need for 8 or more, significantly cutting down labor requirements.
Auxiliary Function Integration: The equipment is also outfitted with a breaker hammer and welding machine, facilitating under-excavation processing and welding operations concurrent with arch installation.
Transport dimensions (L × W × H) | 11360×3665×3355mm |
Total weight | 38t |
Engine power | 138.5kW (National IV) |
Installed electrical power | 159kW |
Operating mode | Electric construction + diesel-powered walking and emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 17×12m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 380mm |
Maximum grade | 36% |
Turning radius | 15m (two wheels)/ 8m (four wheels) |
Maximum speed | 15km/h |
Approach angle/departure angle | 15.4°/15.7° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Advance beam | 5590mm(6200/4990mm) |
Drill Pipe | 4305mm(4915/3700mm) |
Maximum drilling depth | 4m(4.6m/3.4m) |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.98m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 16m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
Grouting system |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.