Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M: A Revolutionary Advance in Tunnel Construction The intelligent integrated Arch Frame Trolley seamlessly combines multiple processes such as measuring, point placement, under-excavation operations, arch frame installation, welding mesh, and connecting ribs. With this machine, the installation of arch frames during the one-time excavation of double-track tunnels is accomplished without moving the machine, ensuring maximum efficiency. This cutting-edge equipment is built on an engineering chassis and features diesel-electric dual power systems along with a two-way driving platform structure. The vehicle boasts excellent driving performance, adapting effortlessly to various complex tunnel road conditions. The arm frame offers both wireless remote control and manual operation, allowing for precise and straightforward control of the robotic arm. The result is a system that is fast, efficient, energy-saving, and safe.
Equipment Digitization (Optional): Our optional digitization package includes advanced features such as cluster management, precise positioning functions, video surveillance, walkie-talkie capabilities, pre/alarm functions, comprehensive data management, tunnel BIM technology, digital twin integrations, construction report management, tunnel contour scanning, and remote control capabilities.
Expandable Hanging Basket: The equipment includes an expandable hanging basket, offering a larger operating space, ideal for installing explosives and anchor rods swiftly and safely.
High Efficiency: Designed with a three-arm, three-gripper, and three-basket structure, the equipment showcases a maximum lifting force of 3 tons on the middle arm. It supports various construction methods, including full-section, two-benching, and three-benching, and can be fully set up within approximately an hour.
Installation of Prefabricated Arch Frames: Our patented techniques for multi-frame prefabricated segmented assembly and folding arch frame installations allow for the creation of arch frames outside the tunnel. This innovation minimizes work time on hazardous surfaces, reducing safety risks and significantly enhancing operational efficiency.
Reduced Operating Personnel: The entire construction operation can be efficiently managed by only 3-4 workers, compared to the traditional requirement of 8 or more, reflecting a substantial decrease in labor costs and manpower.
Auxiliary Function Integration: Equipped with a breaker hammer and welding machine, this versatile equipment can handle under-excavation processing and welding tasks simultaneously during arch installation, enhancing functionality and efficiency.
Compact Design: The vehicle’s lightweight and compact design make it exceptionally adaptable to small-section construction conditions, ensuring it can maneuver through tight spaces with ease.