Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The intelligent integrated vehicle-mounted arch frame trolley is a revolutionary device that seamlessly combines steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement into one versatile machine. Mounted on a highly adaptable vehicle chassis, this equipment ensures flexible movement, smooth transitions, and rapid response to emergencies, guaranteeing reliable and efficient performance under any circumstances. All three booms of the machine can be operated remotely, while the left and right booms also offer manual control from the hanging basket. This reduces labor costs, minimizes construction risks, boosts efficiency, and facilitates the standardization and industrialization of tunnel vertical arches.
Equipment Digitalization (Optional): This cutting-edge equipment can be enhanced with a suite of digital features, including cluster management, precise positioning, video surveillance, intercom functionality, pre/alarm notifications, comprehensive data management, tunnel BIM technology, digital twin simulations, construction report management, tunnel contour scanning, remote control capabilities, and more.
High Efficiency: Featuring three arms and three grippers, along with a multi-degree-of-freedom manipulator, the LCG312C offers unparalleled lifting capabilities with a maximum single-arm lifting force of 1.5 tons. This meets all requirements for prefabricated arch installation, diverse benching operations, and precise positioning and adjustments. Remarkably, the entire vertical support construction process takes merely about an hour to complete.
Installation of Prefabricated Arch Frames: Our company proudly employs patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5) to produce arch frames outside the tunnel. This innovative approach significantly reduces working time on hazardous surfaces, enhances construction safety, and dramatically improves overall efficiency.
Reduced Operating Personnel Requirement: Astonishingly, the entire construction operation can be efficiently completed by just 3 people, compared to the traditional requirement of 8 or more personnel, thereby optimizing labor usage and reducing costs.
Additional Options: The LCG312C can be customized with additional features tailored to specific needs, such as an electric drive for hydraulic systems, breaker for under-excavation operations, electric welding machine, and more, ensuring adaptability to various operational conditions.