Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a groundbreaking device that seamlessly combines steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Designed with a robust vehicle chassis, it ensures exceptional flexibility in movement, transition, and emergency situations, effortlessly completing tasks reliably and efficiently in any scenario. All three booms can be operated remotely, with the left and right booms also manually controllable from the hanging basket. This innovation significantly reduces labor costs, mitigates construction risks, enhances efficiency, and paves the way for standardized and factory-based tunnel vertical arch construction.
Equipment Digitization (Optional): Our cutting-edge features include cluster management, precise positioning, video surveillance, intercom capabilities, pre/alarm functions, comprehensive data management, tunnel BIM technology, digital twin integration, construction report management, tunnel contour scanning, remote control, and much more. These optional digital tools are designed to elevate your operational efficiency and safety to the next level.
High Efficiency: Equipped with three arms and three grippers, and a multi-degree-of-freedom manipulator, the LCG312C boasts a maximum lifting force of 1.5 tons per arm. This ensures it can effortlessly handle the installation of prefabricated arches, execute various benching method operations, and achieve precise positioning and adjustment of the arch. The entire vertical support construction process is streamlined to about an hour, maximizing productivity and minimizing downtime.
Installation of Prefabricated Arch Frames: Leveraging our patented multi-frame prefabricated segmented assembly installation techniques (A Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), our machine produces arch frames outside the tunnel. This strategy considerably reduces the time required on hazardous surfaces, mitigates safety risks, and significantly enhances overall operational efficiency.
Minimized Operating Personnel: Remarkably, the entire construction operation can be efficiently managed by a team of just three people, a stark contrast to the traditional requirement of eight or more personnel, thus optimizing labor utilization and reducing costs.
Additional Options: Our equipment offers customizable options to suit specific operational needs, including an electric drive for hydraulic systems, a breaker for under-excavation operations, an electric welding machine, and more. These additions provide versatile solutions tailored to enhance and adapt to varying project demands.