Customization: | Available |
---|---|
Warranty: | 1 Year, 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The LGM312N intelligent integrated arch anchor trolley is designed with an advanced engineering chassis and a robust dual anchor system. Boasting four-wheel steering and drive, along with two-way driving capabilities, this machine is built for versatility and precision. Its diesel-electric dual power system ensures seamless electric construction and reliable diesel-powered emergency operations. The innovative three-arm remote control allows for the precise installation of prefabricated arch frames, supports diverse benching methods, and offers flawless positioning adjustments. Additionally, the flexible arch frame accommodates under-excavation and welding tasks, making it a comprehensive solution for tunnel construction.
Functional integration: The intelligent integrated arch anchor trolley merges multiple critical processes into one streamlined system: from measuring and point placement, under-excavation operations, and arch frame installation, to anchor net setup, advance support, and system anchor construction. Optional anchor grouting and many other automated procedures ensure unparalleled efficiency and accuracy.
Equipment digitization (Optional): The trolley includes sophisticated digital features such as cluster management, precise positioning, video surveillance, walkie-talkie functionality, pre/alarm systems, and comprehensive data management. Enhanced with tunnel BIM technology, digital twin capabilities, and detailed construction reporting for a modern, data-driven approach.
management, tunnel contour scanning, remote control, and other functions.
High efficiency: Equipped with a three-arm, three-gripper, and three-basket structure, the LGM312N delivers a maximum lifting force of 3 tons via the middle arm, completing the entire construction process in approximately one hour.
Installation of prefabricated arch frames: Utilizing our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, the arch frames are manufactured outside the tunnel. This approach minimizes time spent on hazardous surfaces, significantly enhances construction safety, and improves overall operational efficiency.
Dual anchor system: Capable of achieving a maximum drilling depth of 4.5m, the dual anchor system allows simultaneous feet locking, system anchoring, and advance anchoring operations using the left and right arm frames.
Rotating deployable hanging basket: The sophisticated rotating hanging basket offers expansive operating space, ideal for the installation of explosives and anchor rods.
Optional grouting function: A state-of-the-art optional grouting system enables rapid grouting operations post-anchor installation, enhancing operational efficiency and structural integrity.
Less operating personnel: This advanced equipment allows the entire construction operation to be efficiently managed by just 3-4 personnel, a stark contrast to the 8 or more typically required in traditional setups.
Auxiliary function integration: The trolley is equipped with a breaker hammer and welding machine, capable of performing under-excavation processing and welding tasks during arch installation, further integrating auxiliary functions for comprehensive construction solutions.