The LG312K The intelligent Smart Architectural Cart with Integrated Trolley, model LG312K, revolutionizes tunneling operations by integrating multiple processes such as surveying, setting out, under-excavation, arch installation, mesh and connecting bar welding (optional), and explosive charging. This cutting-edge machine excels in one-time excavation and arch installation without the need to reposition, optimizing efficiency. Built on a robust engineering chassis, it features a versatile diesel-electric dual power system, short wheelbase, compact body, and exceptional maneuverability, making it perfect for challenging tunnel conditions. The boom's operations can be effortlessly managed through wireless remote control or manual control, ensuring unparalleled safety, speed, efficiency, and energy conservation.
Expandable Man Basket: The equipment includes an expandable man basket, offering a spacious work area that can accommodate 3-6 people. It is ideal for tasks such as loading explosives and anchor rods, enhancing operational flexibility.
High Efficiency: Featuring a three-arm structure with three grippers and three hanging baskets, the LG312K adapts to full sections, two-step, and three-step construction methods. The entire vertical frame construction can be completed in approximately one hour, dramatically boosting productivity.
Installation of Precast Arch: Utilizing our patented multi-frame precast arch technology (Patent No. ZL202022537953.5), the LG312K significantly reduces work duration and construction risks in hazardous areas. This innovation enhances overall construction efficiency.
Reduction of Number of Operators: The LG312K allows complete construction operations to be conducted by just 3-4 people, unlike traditional methods that require 8 or more operators, thus optimizing labor costs and efficiency.
Auxiliary Function Integration: Equipped with a breaking hammer, the LG312K enables immediate under-excavation once the arch is set, streamlining construction processes.
Small Overall Dimensions: Designed with a lightweight and compact structure, the LG312K is perfect for small section construction conditions, offering unmatched versatility and ease of use.
Equipment Informatization (Optional): The LG312K supports advanced functionalities such as cluster management, positioning, video monitoring, intercom, pre-alarm, data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, and remote control, offering comprehensive operational oversight and control.